Calculator search

Find the Right Calculator by Domain

Type what you are trying to work out — a product, a temperature, a duty, a cost — and filter by domain. Every result shows the calculator, a worked example and a direct handoff into a quote request.

25 of 25 calculators match

Cold room size calculatorRoom size, space and capacity

A frozen packaged-food room receives 20 t/day and holds 14 days at 6 m clear height.

280,000 kg ÷ 400 = 700 m³ net → 700 × 1.30 = 910 m³ gross → 910 ÷ 6 ≈ 152 m² floor → 910 ÷ 2.2 ≈ 414 Euro-pallet equivalents = 910 m³ (32,137 ft³), about 152 m² (1,636 ft²) and 414 pallet equivalents.

sizing
Facility sizing calculatorRoom size, space and capacity

New frozen store for 500 EUR pallets, no existing fault.

500 × 3.2 = 1,600 m³ (56,500 ft³) → 1,600 ÷ 6 = 267 m² (2,870 ft²) → 1,600 × 32 ÷ 1000 = 51.2 kW base → 51.2 × 1.20 = 61.4 kW = ≈ 61.4 kW required duty (≈ 17.5 TR · 209,600 BTU/h). With 'plant older than 12 years' (+20%) it becomes ≈ 73.7 kW.

sizing
Warehouse capacity plannerRoom size, space and capacity

A 5,000 m² (53,820 ft²) distribution centre with 12 m (39.4 ft) clear height and selective racking.

Rack levels = floor((12 − 1.5) ÷ 1.65) = 6 → Effective area = 5,000 ÷ 1.35 ≈ 3,704 m² → Positions ≈ 3,704 × 0.95 × 0.55 × 6 × 0.85 ≈ 9,875 → Annual throughput ≈ 9,875 × 18 = 177,750 pallets = About 9,875 pallet positions and 177,750 pallets per year of throughput.

sizing
Cold storage growth plannerRoom size, space and capacity

Frozen cold store growing from 10,000 to 18,000 pallets, inbound 220 → 380 pallets/day, 6 doors, 800 kW installed.

18,000 × 0.075 = 1,350 kW → 380 × 0.85 = 323 kW → 6 × 1.727 × 6 = 62 kW → Peak = 1,735 kW · gap = 935 kW · utilisation 217% = New peak ≈ 1,735 kW (≈ 493 TR · 5.9 million BTU/h) — plant upsizing or a second plant is very likely required.

sizing
Cooling capacity calculatorRefrigeration duty and equipment

A 2,000 m³ frozen room in a hot/arid climate with a 20% safety factor.

Base = 2,000 × 38 ÷ 1,000 = 76.0 kW → Climate adjusted = 76.0 × 1.20 = 91.2 kW → Design = 91.2 × 1.20 = 109.44 kW = About 109 kW, 31.1 TR or 373,000 BTU/h.

duty
Refrigeration load calculatorRefrigeration duty and equipment

A 500 m² chilled room, 6 m high, receives 15,000 kg/day at 22 °C.

Transmission = 11.52 kW → Product pull-down = 12.50 kW → Infiltration = 3.74 kW; internal gains = 4.14 kW → Average load 31.90 × 24 ÷ 18 × 1.15 = 48.91 kW = 48.91 kW (13.91 TR), planning band 36.35–61.47 kW.

duty
Door infiltration load calculatorRefrigeration duty and equipment

A frozen-store doorway during a warm, humid operating day.

Air exchange = 0.22 × area × √(g × height × density difference) → Peak load × (1 − curtain effectiveness) → Average = peak × open seconds ÷ 86,400 = About 10.6 kW average added duty from door openings.

duty
Compressor sizing calculatorRefrigeration duty and equipment

Preliminary NH₃ compressor family for 150 kW at −30 °C evaporating and 40 °C condensing.

COP ≈ 3.1 × 60 ÷ 70 = 2.66 → Motor ≈ 150 ÷ 2.66 = 56.5 kW → Displacement ≈ 480 m³/h = About 56.5 kW motor input and a screw-compressor family — not a manufacturer selection.

duty
Insulation panel calculatorRefrigeration duty and equipment

A 30 × 20 × 8 m frozen room at −20 °C in a 35 °C ambient uses PIR panels.

Thickness = 125 mm (4.92 in) → U = 0.022 ÷ 0.125 = 0.176 W/m²K → Envelope area = 2,000 m² → Heat gain = 0.176 × 2,000 × 55 ÷ 1000 = 19.4 kW = 125 mm panels with about 19.4 kW transmission heat gain.

duty
CO₂ vs ammonia comparisonRefrigeration duty and equipment

600 kW frozen-storage plant in a warm climate (peak ~38 °C), 6,000 run hours.

CO₂ COP = 1.9 ÷ 1.12 = 1.70 → 354 kW → 2.12 GWh/yr → NH₃ COP = 1.9 ÷ 1.03 = 1.84 → 325 kW → 1.95 GWh/yr = Ammonia uses ≈ 8% less energy at this climate; in cool climates the CO₂ penalty disappears and the gap reverses.

duty
Backup generator calculatorRefrigeration duty and equipment

A 120 kW refrigeration plant with 25 kW auxiliaries needs 24-hour standby power and soft starting.

Running = 120 × 0.85 + 25 = 127 kW → Peak ≈ 146 kW → Generator = 146 ÷ 0.80 × 1.20 → 225 kVA → Fuel ≈ 906 L (239 US gal) = One 225 kVA generator and about 906 L of fuel for 24 hours.

duty
Blast freezer calculatorFreezing and sector rooms

Freeze a 20 t (44,092 lb) fish batch to a −18 °C core in an air-blast tunnel.

20,000 × 290 = 5,800,000 kJ → 5,800,000 ÷ (8 × 3,600) ≈ 201 kW → 201 × 1.20 ≈ 242 kW = About 242 kW plant duty (68.8 TR · 826,000 BTU/h).

freezing
IQF freezer sizing calculatorFreezing and sector rooms

An IQF vegetable line freezes 2,000 kg/h for 16 hours/day with product entering at 15 °C.

2,000 ÷ 3,600 × 330 ≈ 183 kW → 183 × 1.30 ≈ 238 kW → 2,000 × 16 ÷ 1,000 = 32 t/day = About 238 kW for 32 t/day.

freezing
Fish & seafood cold storage calculatorFreezing and sector rooms

Whitefish blocks, 30 t/day held 20 days at −25 °C, 7 m building, 35 °C ambient.

600,000 ÷ 480 = 1,250 m³ net → 1,250 ÷ 0.45 = 2,778 m³ gross (98,100 ft³); floor ≈ 463 m² (4,980 ft²) → 2,778 × 24 × 1.075 ÷ 1000 = 71.7 kW = ≈ 72 kW holding load (≈ 20 TR · 245,000 BTU/h) and ≈ 667 pallet positions.

freezing
Meat cold room calculatorFreezing and sector rooms

Beef carcass chilling, 15 t/day held 4 days, 5.5 m room, 32 °C ambient.

60,000 ÷ 200 = 300 m³ net → 750 m³ gross (26,500 ft³) → Rail = 60,000 ÷ 320 ≈ 188 m (615 ft) → Envelope = 750 × 45 × 1.04 ÷ 1000 = 35.1 kW → Product = 15,000 × 3.2 × 34 ÷ 72,000 = 22.7 kW = ≈ 57.8 kW chilling duty (≈ 16.4 TR · 197,000 BTU/h).

freezing
Supermarket refrigeration calculatorFreezing and sector rooms

Mid-size supermarket on a transcritical CO₂ pack with doored chilled cabinets.

45 × 0.42 = 18.9 kW · 18 × 0.55 = 9.9 kW · 180 × 0.055 = 9.9 kW → Duty = 38.7 kW → pack 44.5 kW → 38.7 × 0.62 × 8,760 = 210,000 kWh / year = ≈ 44.5 kW pack (≈ 12.7 TR · 152,000 BTU/h) and ≈ 210 MWh of refrigeration electricity per year.

freezing
Electricity cost calculatorEnergy and running cost

A 5,000 m³ frozen store has 120 kW duty, COP 2.6, 8,000 h/year and 0.55 average load.

120 ÷ 2.6 = 46.15 kW → 46.15 × 8,000 × 0.55 ≈ 203,077 kWh/year → Energy ≈ USD 24,369; surcharge ≈ USD 3,655 = About USD 28,024 per year before taxes.

energy
Pharma cold storage energy calculatorEnergy and running cost

One +2/+8 °C pharmaceutical room with 60 kW refrigeration duty at COP 2.8.

60 ÷ 2.8 = 21.43 kW → 21.43 × 8,000 × 0.70 = 120,000 kWh → 120,000 × 0.18 = USD 21,600 = USD 21,600 per year, USD 216,000 over ten years before escalation.

energy
Cold storage OPEX estimatorEnergy and running cost

4,000 m³ frozen store in a warm climate with daily dispatch and a standard modern plant.

4,000 × 42 × 1.15 × 1.12 × 1.00 ÷ 1000 = 216 kW average → 216 × 8,760 = 1.90 million kWh / year → Multiply by your tariff for the power line = ≈ 1.9 GWh per year of refrigeration electricity (≈ 216 kW ≈ 61 TR average) before maintenance, monitoring and labour.

energy
Refrigeration equipment ROI calculatorInvestment, ROI and bid comparison

A retrofit requires USD 605,000 installed and produces USD 145,000 annual net benefit over ten years.

Simple payback = 605,000 ÷ 145,000 = 4.2 years → NPV discounts ten annual benefits at 10% = 4.2-year simple payback; read NPV and IRR on the live tool.

investment
Refrigeration retrofit ROI calculatorInvestment, ROI and bid comparison

Retrofit of a plant using 600,000 kWh/yr with a 22% improvement (the page's default inputs).

600,000 × 22% = 132,000 kWh → 19,800 /yr → Annual saving = 19,800 + 10,000 = 29,800 → Net investment = 240,000 + 18,000 = 258,000 → Payback = 258,000 ÷ 29,800 = 8.7 years = Simple payback ≈ 8.7 years; a grant or a higher improvement shortens it directly.

investment
Refrigeration TCO calculatorInvestment, ROI and bid comparison

Supplier A: 180 kW, COP 2.6, USD 420,000 CAPEX, USD 14,000/year maintenance, two downtime days.

180 ÷ 2.6 × 6,000 × 0.75 ≈ 311,538 kWh → Energy = USD 46,731/year → Operating = USD 76,731/year = 10-year TCO about USD 1.187 million for Supplier A.

investment
Refrigeration bid comparisonInvestment, ROI and bid comparison

Supplier B quotes USD 780,000 for 420 kW but excludes civil, insulation and electrical scope.

Allowance = 1,050,000 × 0.33 = USD 346,500 → Comparable = 780,000 + 346,500 = USD 1,126,500 = Partial scope exposed and restated — the tool does not rank or recommend bidders.

investment
Financing calculatorInvestment, ROI and bid comparison

Illustrative financing of a USD 2,000,000 project with 15% down over seven years at 7.5%.

Down payment = USD 300,000 → Principal = USD 1,700,000 → Monthly ≈ USD 26,075 = About USD 2,490,306 total paid. ColdMatch does not lend; qualified projects may be introduced to independent financing partners.

investment
Cold room troubleshooting toolDiagnostics

A freezer room does not reach −20 °C; 30 °C ambient, frequent door opening, heavily iced evaporator.

Door infiltration 6 + 2 × 3 = 12 → Defrost 5 + 1 × 3 = 8 → Condenser 4 + 0 = 4 = Infiltration first (High), defrost second (High), condenser third (Medium) — inspection priorities, not a diagnosis.

diagnostics