Cold room size calculatorRoom size, space and capacity
A frozen packaged-food room receives 20 t/day and holds 14 days at 6 m clear height.
280,000 kg ÷ 400 = 700 m³ net → 700 × 1.30 = 910 m³ gross → 910 ÷ 6 ≈ 152 m² floor → 910 ÷ 2.2 ≈ 414 Euro-pallet equivalents = 910 m³ (32,137 ft³), about 152 m² (1,636 ft²) and 414 pallet equivalents.
Door infiltration load calculatorRefrigeration duty and equipment
A frozen-store doorway during a warm, humid operating day.
Air exchange = 0.22 × area × √(g × height × density difference) → Peak load × (1 − curtain effectiveness) → Average = peak × open seconds ÷ 86,400 = About 10.6 kW average added duty from door openings.
Compressor sizing calculatorRefrigeration duty and equipment
Preliminary NH₃ compressor family for 150 kW at −30 °C evaporating and 40 °C condensing.
COP ≈ 3.1 × 60 ÷ 70 = 2.66 → Motor ≈ 150 ÷ 2.66 = 56.5 kW → Displacement ≈ 480 m³/h = About 56.5 kW motor input and a screw-compressor family — not a manufacturer selection.
Backup generator calculatorRefrigeration duty and equipment
A 120 kW refrigeration plant with 25 kW auxiliaries needs 24-hour standby power and soft starting.
Running = 120 × 0.85 + 25 = 127 kW → Peak ≈ 146 kW → Generator = 146 ÷ 0.80 × 1.20 → 225 kVA → Fuel ≈ 906 L (239 US gal) = One 225 kVA generator and about 906 L of fuel for 24 hours.
Cold storage OPEX estimatorEnergy and running cost
4,000 m³ frozen store in a warm climate with daily dispatch and a standard modern plant.
4,000 × 42 × 1.15 × 1.12 × 1.00 ÷ 1000 = 216 kW average → 216 × 8,760 = 1.90 million kWh / year → Multiply by your tariff for the power line = ≈ 1.9 GWh per year of refrigeration electricity (≈ 216 kW ≈ 61 TR average) before maintenance, monitoring and labour.
Refrigeration equipment ROI calculatorInvestment, ROI and bid comparison
A retrofit requires USD 605,000 installed and produces USD 145,000 annual net benefit over ten years.
Simple payback = 605,000 ÷ 145,000 = 4.2 years → NPV discounts ten annual benefits at 10% = 4.2-year simple payback; read NPV and IRR on the live tool.
Financing calculatorInvestment, ROI and bid comparison
Illustrative financing of a USD 2,000,000 project with 15% down over seven years at 7.5%.
Down payment = USD 300,000 → Principal = USD 1,700,000 → Monthly ≈ USD 26,075 = About USD 2,490,306 total paid. ColdMatch does not lend; qualified projects may be introduced to independent financing partners.