Cost Center

Cold-chain & refrigeration cost guides

Planning cost ranges for buyers of new cold storage, refrigeration plants and cold-chain upgrades, taken from ColdMatch's published 2026 cost baseline with the assumptions stated on each page. They are budget guides, not quotes: only supplier quotations for your own scope are binding.

Which cost answer fits your project?

Cold storage is priced in different units at different scales. Pick the page that matches what you are building. ColdMatch publishes build costs; it does not publish storage rental rates.

How to use these cost figures

  • Pick the right unit first. A cold room is priced by room size, a warehouse per m³ or pallet position, a blast freezer per tonne per day of freezing, and a refrigeration plant per kW of cooling. Comparing figures in different units gives misleading budgets.
  • Check what the range includes. Most ranges cover panels, refrigeration, doors, controls and installation inside a prepared building. The building shell, civil works, standby power, racking and grid upgrades are usually priced separately.
  • Adjust for your site. Ambient temperature, electricity supply, freight, import duties and local labour move the final price; the calculators let you enter your own location and tariff.
  • Turn the budget into one specification. Send every supplier the same scope sheet so quotes compare like for like; see how to compare cold storage quotations.