Quick answer
A step-by-step look at ColdMatch Group's human-reviewed procurement process: request, project brief, supplier search, introductions and comparable offers. No. ColdMatch is a human-reviewed procurement platform. A specialist reviews each request and prepares a brief before any supplier is contacted, then introduces relevant suppliers manually.
Key takeaways
- Is ColdMatch an online marketplace? No.
- Does ColdMatch charge buyers? There is no sourcing fee for qualified buyers.
- What size of project does ColdMatch handle? Commercial and industrial cold-chain projects, typically from USD 250K upward, including cold stores, blast freezing, pharma storage and industrial refrigeration plants.
- How many suppliers does ColdMatch work with? ColdMatch works with a global network of 100+ manufacturers, integrators, contractors and EPC firms, and introduces only those that fit the specific project.
Reviewed: Oct 2026 · ColdMatch Group
Buying industrial refrigeration or a cold storage facility is rarely a catalogue purchase. Each project combines building envelope, refrigeration plant, controls, power, installation and long-term service, and every supplier prices those elements differently. Buyers who send a short email to five companies often receive five offers that cannot be compared. ColdMatch Group was created to fix that problem. This article explains, step by step, how the platform works, what happens to a request, who is involved, what it costs and what a buyer should expect at the end.
Short answer: ColdMatch Group is the industrial refrigeration and cold-chain procurement platform of Global B2B Group. A buyer submits a project request; a specialist reviews it and prepares a structured brief; only then are relevant qualified suppliers identified and introduced; proposals come back on a comparable basis. It is not an automatic marketplace, and it is free for qualified buyers.
Who the platform is for
ColdMatch serves commercial and industrial projects, typically from USD 250K upward: food processors, logistics and 3PL operators, pharmaceutical distributors, agricultural cooperatives and exporters, retailers building distribution centres, developers, consultants and EPC contractors acting for clients. Projects include cold rooms and cold stores, blast freezing and IQF, pharma GDP storage, ammonia and CO₂ refrigeration plants, multi-temperature distribution centres and the supporting power, insulation and automation. Smaller single-room purchases are usually better served directly by a local installer.
Step 1 — The request
Everything starts with a request through the quote form, the more detailed RFQ builder or the procurement request page. The buyer describes the product, temperatures, capacity, site, timeline and budget band. Calculators can feed their results straight into these forms, so estimates for cooling load, room size or cost do not have to be retyped. A request does not need to be perfect; it needs to be honest about what is known and what is not.
Step 2 — Human review and the project brief
A specialist reads every request. This is the step that distinguishes ColdMatch from directory or lead-selling sites. The specialist checks whether the scope is consistent — for example, whether the stated capacity matches the cooling load, or whether a pharma project mentions monitoring and redundancy — and may come back with questions. The result is a structured project brief: a document that defines capacity, temperature zones, site conditions, standards, scope of supply, exclusions, timeline and decision process. The brief is what makes later proposals comparable.
Step 3 — Supplier search, after understanding the project
Supplier search starts only once the project is understood. ColdMatch works with a network of 100+ suppliers worldwide — manufacturers, system integrators, contractors and EPC firms — and considers technology fit, project size, destination-market compliance, installation and service coverage near the site, and relevant references. The goal is a short list of suppliers who can genuinely deliver, not the longest possible list. Supplier directory pages on the website exist for discovery and research; they are not an automatic matching engine.
Step 4 — Introductions

Relevant suppliers are introduced manually, with the brief, so everyone starts from the same information. The buyer stays in control: they decide who to speak with, what is shared and when. Consultants and engineers acting for a client can remain the main point of contact throughout.
Step 5 — Comparable proposals
Because every supplier quoted against the same brief, proposals can be compared line by line: equipment, capacity, energy use, scope inclusions and exclusions, installation, commissioning, warranty, service and price. Differences that would normally hide inside vague offers — a missing floor insulation, a single compressor instead of N+1, installation excluded — become visible before contract. Our article on NH₃ vs CO₂ refrigeration shows the kind of technical questions this comparison should cover.
What it costs
There is no sourcing fee for qualified buyers. ColdMatch's commercial relationships are with suppliers. Project costs — equipment, engineering, freight, duties, installation, commissioning, service — are quoted and invoiced by the suppliers themselves. ColdMatch does not resell equipment and does not add a hidden margin to buyer invoices.
What ColdMatch is not
- Not a manufacturer or contractor: it does not build, install or take engineering responsibility.
- Not an automatic marketplace: requests are reviewed by a person before any supplier is contacted.
- Not a lender: neither ColdMatch nor Global B2B Group lends money or gives financial advice; qualified projects may be introduced to independent financing partners — see financing.
- Not a certification body: compliance is confirmed by engineers, validators and authorities.
The Global B2B Group ecosystem
ColdMatch is one of several specialist procurement platforms in Global B2B Group, each focused on one sector so that knowledge and supplier networks stay deep rather than broad. Seed sourcing is handled by SeedMatch, animal feed by FeedMatch, aquaculture by FishMatch and hatcheries and poultry by HatchMatch. When a project's core is outside the cold chain, it is referred to the right platform rather than stretched to fit.
Tools that support the process
Buyers can prepare before submitting with the calculator library, the cold chain master planner, the decision wizard and the RFQ readiness check. The cold chain questions hub answers common technical and commercial questions and links each one to the right calculator. To learn more about the team and past project reviews, see the company profile.
A worked example
Consider a fruit exporter planning a 3,000-pallet multi-temperature store with pre-cooling, in a hot climate with an unstable grid. The first request mentions capacity and location but not intake rate, design ambient temperature, power situation or whether the packhouse is included. In review, the specialist asks those questions, checks the stated capacity against the cooling load calculator, and suggests that generator backup and insulated floors should be specified rather than left to each supplier. The resulting brief defines four rooms with their temperatures, peak daily intake, design ambient temperature, backup expectations, scope boundaries with the civil contractor and a target date before harvest.
With that brief, three suppliers with experience in hot-climate fruit storage and local service capability are introduced. Their proposals can now be compared on energy at 45 °C ambient, redundancy, installation time and service response — instead of on three incompatible prices. The buyer chooses with a clear reason and a contract that names what is included.
How long the process takes
Timing depends on the project and on how much is already defined. A clear request can move to a structured brief within days; supplier introductions follow once the brief is agreed; and proposal timelines depend on the suppliers and the complexity of the scope. Large projects with engineering studies, permits or financing naturally take longer. The single biggest factor in speed is the completeness of the initial information — which is why the planning tools and readiness check exist.
Confidentiality
Project details are shared with suppliers only as needed for the introduction and only with the buyer's knowledge. Buyers can ask for commercially sensitive information to be withheld until a supplier has been shortlisted. Consultants decide what is passed on to their clients and when.
Getting started
The fastest route is to describe the project as it stands today — even with gaps — and let the review step fill them. Start your project, or use the RFQ builder if you already have a detailed scope.
Run the numbers
Calculators for this project type
Indicative planning figures only — final sizing belongs to the supplier's or consultant's detailed design.
Blast freezer cost calculator
Size freezing capacity and indicative cost from daily tonnage, entry and target core temperature.
Energy & backup powerEnergy & backup power cost calculator
Annual energy spend from load and running hours, plus the cost of generator hours during outages.
Frequently asked questions
Plan the numbers before you send an RFQ
The reference pages buyers use most before requesting quotes.