Quick answer
Why ColdMatch is not an automatic marketplace: how a specialist reviews your brief, searches suppliers and introduces qualified partners for cold-chain… No. A specialist reviews each request, prepares a structured brief and introduces a small number of suitable suppliers manually, only after the project is understood.
Key takeaways
- Does ColdMatch send my request to many suppliers automatically? No.
- What size of project does ColdMatch handle? The focus is industrial refrigeration and cold-chain projects of around USD 250K and above, such as cold stores, blast freezing, pharmaceutical cold chains and NH₃ or CO₂ systems.
- Does ColdMatch sell equipment or provide loans? No.
- Are companies in the directory automatically sent my project? No.
Reviewed: Oct 2026 · ColdMatch Group
Buyers of industrial refrigeration and cold storage often arrive with one expectation: that a procurement platform works like an online shop or a lead marketplace, where a form is sent to dozens of manufacturers and quotations start flooding in. ColdMatch Group deliberately does not work that way. Large cold-chain projects — cold stores, blast freezing lines, pharmaceutical warehouses, ammonia or CO₂ plants — are too technical and too expensive for automatic matching. Sending an unclear request to many suppliers produces proposals that cannot be compared, wastes the time of serious manufacturers and exposes buyers to unqualified offers. This article explains the managed introduction model step by step, what you can expect at each stage and how to get the most out of it.
Short answer: ColdMatch Group is the industrial refrigeration and cold-chain procurement platform of Global B2B Group. You submit a project request; a specialist reviews it and prepares a structured brief; the supplier search starts only once the project is understood; then qualified suppliers are introduced manually. The directory pages on the site are for discovery and research, not for automatic connections.
Why not an automatic marketplace?
Automatic marketplaces work well for standard products with clear specifications. A cold storage project is rarely standard. Two warehouses of the same floor area can need completely different refrigeration systems depending on temperature, throughput, climate, power availability and local refrigerant rules. When a buyer's request is sent unchanged to many suppliers, each supplier fills the gaps with its own assumptions. The result is a set of proposals with different scopes, different capacity assumptions and different exclusions — impossible to compare without starting again. Manufacturers know this, and the best of them often ignore mass requests altogether.
The managed model reverses the order. First the project is understood and written down clearly; only then is it shared with a small number of suppliers whose experience fits. That protects the buyer's time, respects the supplier's engineering effort and leads to proposals that answer the same question.
Step 1: Submit your project request
Everything starts with a request through the quote form or the more detailed RFQ builder. You describe what you want to build or upgrade: products, temperatures, capacity, location, timeline and budget range. You do not need a complete technical specification; the calculators on the site — such as the cold storage capacity calculator or the cooling load calculator — help you prepare first figures, and their results can be passed into the request.
Step 2: Specialist review and project brief
A specialist reads the request and checks whether it fits the platform's focus on industrial refrigeration and cold-chain infrastructure, typically projects of USD 250K and above. If information is missing or unclear, you are contacted with targeted questions: Which products and temperature classes? What peak throughput? Is the building existing or new? Which refrigerant is preferred or required locally? The output is a structured project brief that a supplier can actually price. Requests that belong to another sector — for example aquaculture or poultry production — are pointed to the relevant specialist platform of Global B2B Group instead.
Step 3: Targeted supplier search

Only once the brief is clear does the supplier search begin. The search looks for manufacturers, contractors and system integrators with relevant experience: the right temperature range, comparable project size, the required refrigerant technology and the ability to deliver and support equipment in your region. A smaller number of well-matched suppliers is the goal, not a long list. The site's directory and market pages help buyers research categories and countries, but being listed in a directory does not mean a company is automatically sent your project.
Step 4: Manual introductions
Selected suppliers are introduced to you personally, with the brief attached so that everyone starts from the same information. From that point you deal with suppliers directly: site visits, technical clarifications, proposals and negotiation. ColdMatch Group does not sell equipment, does not take sides between suppliers and does not guarantee outcomes. Where a qualified project needs funding, it may only be introduced to independent financing partners; neither ColdMatch nor Global B2B Group lends money or gives financial advice.
Step 5: Comparing proposals
Because every supplier received the same brief, proposals are far easier to compare. Look at full scope, not equipment price alone: installed capacity at your design conditions, energy use, redundancy, controls, commissioning, training, warranty and service response. Our guide on how to compare cold storage supplier proposals offers a scoring framework, and the cold storage cost guide gives consistent planning ranges for sanity checks.
What you can expect — and what you cannot
- You can expect a human review of every request, clear questions when information is missing, a structured brief, and introductions only to suppliers whose experience matches the project.
- You can expect vendor-neutral guidance: the platform does not favour one technology or manufacturer.
- You should not expect instant quotations within minutes, automatic distribution to every company in a directory, or guaranteed prices.
- You should not expect loans or financial advice; financing introductions, where relevant, are to independent partners only.
How to get the most out of the process
Give honest figures, even if they are rough. A realistic budget range and timeline help the specialist judge which suppliers fit. Share drawings, site photos or existing equipment lists if you have them. Say what matters most to you — lowest life-cycle cost, fastest delivery, a specific refrigerant, local service — because that shapes the search. And answer review questions quickly: a complete brief is the single biggest factor in receiving useful proposals. The project readiness check shows which information is still missing before you submit.
Who the model suits best
The managed model suits owners, developers, food and pharma companies, logistics operators and public bodies planning substantial cold-chain investments: new cold stores, extensions, blast freezer lines, refrigeration plant replacements, or multi-site programmes. It is less suited to small one-off equipment purchases, which are usually faster through a local distributor. If you are unsure, submit a short request — the review will tell you whether the platform is the right route.
A typical example
A food processor in East Africa plans a frozen store and a blast freezing line for exported vegetables. The first request lists a target capacity and a budget range but no throughput, no refrigerant preference and no information about grid power. During review, the specialist asks for daily intake at harvest peak, packaging format, the site's power connection and any export customer standards. With those answers, the brief describes two temperature zones, a blast freezer with a defined hourly capacity and a refrigerant choice compatible with local service capability. Only then are a small number of suppliers with comparable projects in similar climates introduced. Each receives the same brief, so the buyer's proposals can be compared on scope, energy use and service — not on guesswork.
Your information stays focused
Project details are shared only with the suppliers introduced for that project, and only to the extent needed for them to understand and price the work. Ask at any time which companies have received your brief. This keeps the process transparent and avoids the uncontrolled distribution that often follows mass online requests.
To learn more about the team and the type of projects reviewed, see the company profile.
Run the numbers
Calculators for this project type
Indicative planning figures only — final sizing belongs to the supplier's or consultant's detailed design.
Blast freezer cost calculator
Size freezing capacity and indicative cost from daily tonnage, entry and target core temperature.
Energy & backup powerEnergy & backup power cost calculator
Annual energy spend from load and running hours, plus the cost of generator hours during outages.
Frequently asked questions
Plan the numbers before you send an RFQ
The reference pages buyers use most before requesting quotes.