Offline — reconnect before saving or submitting. Changes on this page have not been sent.

ColdMatch / Technology radar

Innovation & Technology

Compare technology against your product duty, site and operating evidence before including it in a project brief. Read the implementation checklist and limits first.

ColdMatch Group is Global B2B Group’s independent industrial refrigeration and cold-chain procurement platform for project owners and developers — not a manufacturer, operator or contractor.

Prepare an RFQReading and tools are free, without an account · Optional managed RFQ: USD 250,000+

For planning purposes only. No promised production, energy, cost, yield or ROI outcomes. Supplier payments never determine inclusion or ranking.

Start with your project decision

For project owners and developers: take the next decision with existing guides, checklists and calculators, then examine the technology evidence below.

Governance & acceptance

Who owns each decision and sign-off?

Define user requirements, package interfaces, commissioning evidence, training, handover and acceptance owners.

Planning support only, not certified engineering, legal advice or a binding quotation. Record project-specific assumptions and responsible specialist reviews.

Industrial refrigeration plant equipment
Illustrative refrigeration equipment — not evidence of a featured deployment.

Evidence & project implications

Destination, season & logistics checklist

A project evidence checklist, not a seasonal forecast. Complete it for each destination using dated operating records, product specifications and responsible local specialists.

Destination & handoffs
Record origin, destination, transport mode, loading/unloading points, planned transit and expected waiting time. Identify who monitors temperature and handles excursions at each handoff.
Season & peak capacity
Record actual peak months, daily intake, dispatch, dwell time and highest stock from dated records. Label forecasts separately; do not turn an annual national trade indicator into a monthly demand estimate.
Temperature & energy duty
Use the product's approved temperature range, incoming temperature, packaging and loading schedule. Record site ambient assumptions, door-opening frequency, power availability and tariff period for capacity and energy comparisons.
Site & unresolved risks
Confirm grid, water where required, vehicle access and dock interfaces. Record the evidence owner, source date and unresolved constraint; leave unknown inputs blank rather than presenting them as verified.

Related source material: FAO post-harvest handling manual for food handling context; existing distribution planning guide and site due diligence checklist. This checklist does not establish a food/pharma specification, legal approval or engineered capacity.

6 / 6

Refrigerant transition

Refrigerant transition starts with system safety

Choosing a lower-impact refrigerant without overlooking the plant design and operating responsibilities.

Application: New or replacement cold-store and process-refrigeration projects where the engineer must compare refrigerant/system combinations.

Technical reference · Maturity not assessed

Recorded source check: · Not a project-specific engineering review.

Read brief

How it works

ASHRAE’s fact sheet describes refrigerant classification and system safety design in Standards 15 and 34, including lower-GWP refrigerant options. A refrigerant label alone is not a complete system specification.

Where it fits

New or replacement cold-store and process-refrigeration projects where the engineer must compare refrigerant/system combinations.

Scale & geography
No numeric capacity threshold or country-wide suitability is established by this brief. Match throughput, temperature duty, local codes and service capability to your actual site; a source country is not an approval for your location.
Operational benefit & economics
Use the customer problem above as the performance question to test. A quantified operational benefit, CAPEX/OPEX saving or ROI is not established here. Request a measured baseline, comparable duty and project-specific costs before accepting a claim.

Procurement implications

Ask the engineer to define the safety design, service capability and applicable local requirements before comparing bids.

Risks, constraints & limits of the evidence

Standards information is not a market-readiness assessment, a jurisdiction-specific legal opinion or proof that a particular design is compliant. No refrigerant is endorsed here.

Questions for vendors and engineers

  • Which classification and system design assumptions apply to the proposed refrigerant?
  • Who owns safety review, commissioning, operator training and maintenance?

RFQ checklist

  • Refrigerant and proposed system architecture
  • Product temperatures, duty and ambient design conditions
  • Site location, safety review and service responsibilities

Source record

Standards 15 & 34-2024 fact sheet

ASHRAE · Technical body

Publication: 2024 editions described in the fact sheet. Last verified: .

Source section: Fact sheet: refrigerant classification and safe design/operation.

Prepare an RFQ
Thermal storage

Thermal storage: separate the prototype from the plant proposal

Exploring whether stored cooling could help a project manage when electricity is used or cope with interruptions.

Application: An evidence reference for retail refrigerated cases; an industrial warehouse proposal would need its own engineering and application evidence.

Research · Application-specific evidence

Recorded source check: · Not a project-specific engineering review.

Read brief

How it works

A DOE project investigates ice-based thermal storage integrated with refrigerated display cases. Stored cooling is intended to be used later rather than produced entirely at the moment of demand.

Where it fits

An evidence reference for retail refrigerated cases; an industrial warehouse proposal would need its own engineering and application evidence.

Scale & geography
No numeric capacity threshold or country-wide suitability is established by this brief. Match throughput, temperature duty, local codes and service capability to your actual site; a source country is not an approval for your location.
Operational benefit & economics
Use the customer problem above as the performance question to test. A quantified operational benefit, CAPEX/OPEX saving or ROI is not established here. Request a measured baseline, comparable duty and project-specific costs before accepting a claim.

Maturity evidence

DOE display-case project: bench-scale prototype; further case-connected testing is described as a milestone, not established industrial deployment.

Procurement implications

If storage is proposed, request a charging/discharging design, controls integration and a product-temperature acceptance plan for the actual facility.

Risks, constraints & limits of the evidence

The presentation labels data preliminary. Project objectives are not verified performance results. Grocery display-case research cannot establish industrial cold-store savings, resilience or readiness.

Questions for vendors and engineers

  • What evidence matches our application rather than a different demonstration?
  • How will charging, storage losses, product temperatures and backup operation be tested?

RFQ checklist

  • Hourly cooling demand and operating schedule
  • Storage medium, available space and charging conditions
  • Control interfaces and project-specific acceptance tests

Source record

Load Shifting and Resiliency for Refrigerated Display Cases

U.S. Department of Energy · Government project-review presentation

Publication: 2024 peer-review presentation. Last verified: .

Source section: Project summary, approach and milestones; preliminary-data notice.

Prepare an RFQ
Variable-speed systems / Energy optimization

Variable speed and sequencing: specify the operating range

Evaluating control changes without assuming a generic energy-saving percentage.

Application: Industrial refrigeration upgrades or new plants where operating loads and control interfaces can be documented.

Technical reference · Maturity not assessed

Recorded source check: · Not a project-specific engineering review.

Read brief

How it works

DOE industrial refrigeration guidance lists variable-speed control for evaporator fans and compressor motors, together with improved compressor and condenser sequencing, as measures for facilities to consider.

Where it fits

Industrial refrigeration upgrades or new plants where operating loads and control interfaces can be documented.

Scale & geography
No numeric capacity threshold or country-wide suitability is established by this brief. Match throughput, temperature duty, local codes and service capability to your actual site; a source country is not an approval for your location.
Operational benefit & economics
Use the customer problem above as the performance question to test. A quantified operational benefit, CAPEX/OPEX saving or ROI is not established here. Request a measured baseline, comparable duty and project-specific costs before accepting a claim.

Procurement implications

Ask bidders to state equipment compatibility, operating limits, control sequences and how baseline and proposed operation will be compared.

Risks, constraints & limits of the evidence

This is general guidance, not a specific deployment study or a quantified site result. The guidance does not establish a maturity stage for an individual proposed system.

Questions for vendors and engineers

  • What operating range and minimum conditions must be maintained?
  • How will control changes be commissioned and energy use measured at comparable duty?

RFQ checklist

  • Load profile and current equipment/control inventory
  • Temperature duty and required operating envelope
  • Energy measurement boundary and commissioning responsibilities

Source record

Industrial Refrigeration

U.S. Department of Energy / Better Plants · Government technical guidance

Publication: Publication date not stated on the checked page. Last verified: .

Source section: Refrigeration efficiency measures: variable-speed controls and sequencing.

Prepare an RFQ
Temperature monitoring / Energy optimization / Cold-room automation

Connected controls: require application-specific validation

Separating a connected-control concept from demonstrated performance in the buyer’s facility.

Application: Questions for connected refrigeration controls; industrial cold-room automation needs separate project evidence. This is not a pharmaceutical validation reference.

Pilot · Application-specific evidence

Recorded source check: · Not a project-specific engineering review.

Read brief

How it works

A DOE field-validation project describes intelligent refrigeration forecasting and control, demand response and continuous commissioning in grocery stores. It is an adjacent-use evidence reference, not validation of warehouse robotics or an industrial cold-room system.

Where it fits

Questions for connected refrigeration controls; industrial cold-room automation needs separate project evidence. This is not a pharmaceutical validation reference.

Scale & geography
No numeric capacity threshold or country-wide suitability is established by this brief. Match throughput, temperature duty, local codes and service capability to your actual site; a source country is not an approval for your location.
Operational benefit & economics
Use the customer problem above as the performance question to test. A quantified operational benefit, CAPEX/OPEX saving or ROI is not established here. Request a measured baseline, comparable duty and project-specific costs before accepting a claim.

Maturity evidence

Grocery-store field-validation project described by DOE; no industrial cold-room deployment is established by this source.

Procurement implications

Define data ownership, sensor/control interfaces, human override and acceptance tests before including connected controls in a tender.

Risks, constraints & limits of the evidence

Projected benefits and milestones are not verified outcomes. No cold-room robotics or pharmaceutical deployment claim is made.

Questions for vendors and engineers

  • Which completed tests match our equipment, product and operating conditions?
  • What happens when the network, sensor or control service fails?

RFQ checklist

  • Product duty, sensors and controller interfaces
  • Data access, retention and cybersecurity responsibilities
  • Alarm response, manual override and acceptance plan

Source record

Refrigeration Energy Management: Field Validation

U.S. Department of Energy · Government project-review presentation

Publication: 2024 peer-review presentation. Last verified: .

Source section: Project summary, field-validation scope and milestones.

Prepare an RFQ
Leak detection

Leak detection: ask how a loss becomes an action

Defining a practical way to investigate refrigerant losses rather than relying on a dashboard alone.

Application: Food and beverage ammonia-refrigeration projects; any other refrigerant or application needs separate evidence.

Technical reference · Maturity not assessed

Recorded source check: · Not a project-specific engineering review.

Read brief

How it works

EPA describes university-led work on ammonia inventory methods and dynamic charge calculations to flag losses, alongside field practices for identifying and addressing leaks.

Where it fits

Food and beverage ammonia-refrigeration projects; any other refrigerant or application needs separate evidence.

Scale & geography
No numeric capacity threshold or country-wide suitability is established by this brief. Match throughput, temperature duty, local codes and service capability to your actual site; a source country is not an approval for your location.
Operational benefit & economics
Use the customer problem above as the performance question to test. A quantified operational benefit, CAPEX/OPEX saving or ROI is not established here. Request a measured baseline, comparable duty and project-specific costs before accepting a claim.

Procurement implications

Specify what will be measured, how an abnormal condition is investigated and who responds. An inventory method is not a substitute for the engineer’s safety-detection design.

Risks, constraints & limits of the evidence

The EPA page summarizes research and field work; it does not validate a universal detection product, detection threshold or regulatory compliance.

Questions for vendors and engineers

  • How are inventory changes distinguished from possible refrigerant losses?
  • Who investigates a flag and records the repair and follow-up?

RFQ checklist

  • Refrigerant inventory and system boundaries
  • Proposed measurement method and investigation workflow
  • Alarm, safety and maintenance responsibilities

Source record

Pollution Prevention Opportunities for Ammonia Emissions in the Food and Beverage Sector

U.S. Environmental Protection Agency · Government project/webinar summary

Publication: Source page; publication date not established in this review. Last verified: .

Source section: University-led ammonia inventory and dynamic charge calculation work.

Prepare an RFQ
Post-harvest handling

Post-harvest handling: start with the product journey

Choosing cooling and handling equipment without first specifying the produce and its journey.

Application: Produce packing, pre-cooling, storage and distribution planning. It is not pharmaceutical storage guidance.

Technical reference · Maturity not assessed

Recorded source check: · Not a project-specific engineering review.

Read brief

How it works

FAO’s horticultural post-harvest reference covers temperature and humidity management, cooling methods, refrigerated transport and storage as parts of post-harvest management.

Where it fits

Produce packing, pre-cooling, storage and distribution planning. It is not pharmaceutical storage guidance.

Scale & geography
No numeric capacity threshold or country-wide suitability is established by this brief. Match throughput, temperature duty, local codes and service capability to your actual site; a source country is not an approval for your location.
Operational benefit & economics
Use the customer problem above as the performance question to test. A quantified operational benefit, CAPEX/OPEX saving or ROI is not established here. Request a measured baseline, comparable duty and project-specific costs before accepting a claim.

Procurement implications

Define incoming product condition, handling stages and environmental requirements before comparing equipment packages.

Risks, constraints & limits of the evidence

This is established technical guidance, not a readiness assessment of a new technology. It does not establish a particular facility’s yield, shelf life or food-safety outcome.

Questions for vendors and engineers

  • Which product-specific conditions must be maintained at each handling stage?
  • How will loading, cooling, storage and transport interfaces be checked?

RFQ checklist

  • Product/cultivar, incoming temperature and throughput
  • Cooling method, storage conditions and handling schedule
  • Packing, loading and refrigerated-transport interfaces

Source record

The role of post-harvest management in assuring the quality and safety of horticultural produce

Food and Agriculture Organization of the United Nations · Technical publication

Publication: Agricultural Services Bulletin 152; source edition, not a new technology announcement. Last verified: .

Source section: Contents and sections on temperature/humidity, cooling, storage and transport.

Prepare an RFQ

Food is not pharma

Product conditions and responsible quality review must be specified for the actual use. A food-monitoring example does not establish pharmaceutical qualification or validation. WHO provides separate pharmaceutical temperature-mapping guidance; a connected sensor or dashboard alone is not proof of compliance.

WHO: Temperature mapping of storage areas

Technical supplement · May 2015 · Verified 18 Oct 2026. Scope: pharmaceutical storage areas.

Take the next decision with existing buyer tools

Include capacity, product and temperature duty, site, energy supply, refrigerant options, controls/automation and logistics in the existing RFQ. ColdMatch reviews and organizes the request, then contacts suitable suppliers on your behalf. No direct supplier messaging or guaranteed outcomes.

Existing technology comparisons

These existing decision guides remain available. Their numerical benchmarks and broad recommendations are not certified by this radar’s source review; request project-specific evidence before using them in procurement.

Project-owner questions

Where should I start when planning a cold-storage warehouse?

Start with products, temperature zones, peak inventory, throughput and dwell time. Use the capacity guide and planner, then record site, grid and water evidence in the site due-diligence checklist. Preliminary calculator outputs do not replace a project-specific engineering design.

Start with capacity planning
Does an ammonia or F-gas checklist prove that a project complies?

No. Requirements depend on the jurisdiction, refrigerant, system and site. Use the regulatory checklist to request current evidence from responsible local specialists, and include safety, permitting, operation and emergency responsibilities in the RFQ. Food guidance does not establish pharmaceutical qualification.

Open the regulatory checklist
How can I compare energy use and total ownership cost fairly?

Use the same duty, operating hours, load, COP, tariff, time horizon, maintenance and scope boundaries for each offer. Record the evidence and unknowns. The energy and TCO calculators are scenario-planning aids, not guaranteed savings, returns or supplier quotations.

Compare TCO assumptions
Is ColdMatch a manufacturer or a direct supplier-contact directory?

No. ColdMatch is the industrial refrigeration and cold-chain procurement platform of Global B2B Group, not a manufacturer, contractor or warehouse operator. Managed procurement is free for buyers with projects from USD 250,000. Your RFQ goes to the ColdMatch team, which validates and organises it, contacts suitable suppliers on your behalf and presents organised responses. Independent providers remain responsible for design, pricing, delivery and warranties.

Prepare a team-reviewed RFQ