NH₃ procurement template
Ammonia refrigeration RFQ template: required inputs, document checklist, one-click copy
An ammonia refrigeration RFQ is only as good as the design basis it fixes. This template gives you the eight input blocks every NH₃ tender needs — duty per suction level, charge limits, safety scope, controls, commissioning and commercial terms — plus the document checklist every bidder must return, so proposals come back comparable instead of contradictory.
A senior cold-chain specialist stays with your project from first brief to commissioning.
Short answer
A complete ammonia refrigeration RFQ contains eight input blocks — project overview, duty per suction level, architecture and charge limit, safety and compliance, equipment and controls, utilities, commissioning and documentation, and commercial terms with a mandatory exclusions list — plus a six-group document checklist covering track record, compliance evidence, safety design, performance, execution and commercial proof. Copy the full template in one click below, or download it as Word, Markdown or plain text.
1. Why the design basis comes first
Most ammonia tenders fail before a single price is quoted: bidders receive an incomplete brief and each assumes a different plant. The template's first three sections exist to prevent that.
- Design ambient and altitude size the condenser — a bidder assuming the wrong one looks cheapest
- Duty per suction level with evaporating temperatures forces every bidder to size the same plant
- A stated maximum charge lets bidders choose the right architecture before pricing, not after award
- Redundancy and heat-recovery expectations stated up front remove the most common scope gaps
2. Safety scope is a line item, not an assumption
Ammonia safety scope is where cheap quotes are simply smaller quotes. The template makes every safety element explicit so it is priced, not discovered later.
- Named design code: IIAR-2, EN 378, ISO 5149 or local equivalent
- Detection layout, emergency ventilation and relief discharge routing as stated scope
- PSM/RMP or Seveso documentation support where thresholds apply
- HAZOP participation and commissioning safety tests included in the priced scope
3. The document checklist is what makes bids comparable
Every bidder returns the same six document groups, so you compare evidence — not brochures.
- Track record: reference plants of comparable duty and climate, with contactable owners
- Compliance: pressure-vessel certification, welding qualifications, country-valid licences
- Performance: compressor selection printouts at your duty, part-load COP, energy at your tariff
- Commercial: itemised exclusions — anything not listed is deemed included
4. From template to comparable proposals
Issue the same document to every bidder, then normalise what comes back before comparing prices.
- Copy the full RFQ in one click, or download it as Word, Markdown or plain text
- Send identical documents to three to five pre-qualified NH₃ suppliers
- Restate every proposal onto the same scope; price the named exclusions back in
- Compare 10-year cost — energy at your tariff, maintenance, overhauls, spares — not headline CAPEX
Who this is for and how ColdMatch works
Best for
Commercial and industrial cold chain projects, typically from USD 250,000 upward: cold rooms, refrigerated warehouses, blast freezers, processing plant refrigeration and distribution hubs.
Not a fit: domestic refrigerators, household or office air conditioning, small repair call-outs, or spare-parts-only enquiries.
Typical cold chain project types
- Fruit, vegetable and horticulture cold storage with pre-cooling
- Meat, poultry and fish chilling plus blast freezing
- Dairy and beverage process cooling
- Pharma and vaccine GDP cold chain (2–8 °C, −20 °C, −70 °C)
- Refrigerated warehouses, 3PL hubs and mobile cold rooms
Cold room vs refrigerated warehouse
A cold room is a single insulated chamber, usually under ~500 m³, serving one process or storage step. A refrigerated warehouse is a multi-zone facility with racking, docks, air locks and a central refrigeration plant, sized by pallet positions and daily throughput rather than by room volume.
What affects project cost
- Storage volume, pallet positions and daily throughput
- Target temperature and ambient design conditions
- Refrigerant choice (NH₃, CO₂, HFC) and plant redundancy
- Panel thickness, doors, air locks and civil works
- Backup power, solar, freight, duties and commissioning
Temperature range checklist
- +12 to +16 °C — bananas, potatoes, curing
- +2 to +8 °C — pharma GDP, dairy, fresh produce
- 0 to +4 °C — meat, fish and chilled distribution
- −18 to −25 °C — frozen storage
- −35 to −40 °C — blast freezing and IQF
RFQ checklist
- Product, temperature and daily intake
- Room dimensions or required pallet positions
- Site location, ambient conditions and power supply
- Backup autonomy and redundancy level
- Budget range, timeline and scope exclusions
Supplier matching process
You define the project once — capacity, temperature and technical requirements. ColdMatch structures it into a supplier-ready RFQ, reviews it with a human specialist, then approaches suitable refrigeration manufacturers, EPC contractors and installers. Offers come back normalised so scope, price and lead time are comparable.
Buyer is not charged
Using ColdMatch to scope a project, run calculators and receive supplier quotations is free for buyers. ColdMatch helps buyers compare suppliers and request quotes; it is an intermediary and does not manufacture equipment, install systems, or provide financing directly. Costs shown are indicative planning figures — only supplier quotations are binding.
Cold chain project types, temperatures and budgets
Use these reference clusters to place a project before contacting suppliers. Figures are indicative planning ranges for commercial and industrial projects from USD 250,000 upward — only supplier quotations are binding.
Project type cluster
- Agriculture and horticulture cold storage
- Pre-cooling plus storage for fruit, vegetables and flowers, usually +2 to +12 °C with high humidity control and fast pull-down after harvest. Sized by daily intake in tonnes, not only by room volume.
- Meat, poultry and fish cold storage
- Chilling at 0 to +4 °C combined with blast freezing at −35 to −40 °C and frozen holding at −18 to −25 °C. Hygienic panels, drainage and separate dirty/clean flows are part of scope.
- Pharmaceutical and API cold storage
- GDP-compliant 2–8 °C rooms, −20 °C and, for some active pharmaceutical ingredients and biologics, −70 °C. Requires mapping, IQ/OQ/PQ, N+1 refrigeration, backup power and alarm escalation.
- Refrigerated warehouse and 3PL distribution
- Multi-zone facilities sized by pallet positions, dock doors and daily throughput. Typical scope covers racking, air locks, dock levellers, a central plant and an energy strategy.
- Food processing plant refrigeration
- Process cooling, chillers, spiral or tunnel freezers and glycol loops integrated with production lines. Usually specified alongside ISO 22000 and HACCP food safety requirements.
- Mobile and containerised cold rooms
- Plug-and-play 20 ft or 40 ft refrigerated units for seasonal peaks, remote sites and temporary capacity, typically −25 to +8 °C with optional solar or generator support.
Temperature range cluster
| Range | Typical use |
|---|---|
| +12 to +16 °C | Bananas, potatoes, onions, curing and ripening rooms |
| +8 to +12 °C | Tropical fruit and chill-sensitive produce |
| +2 to +8 °C | Pharma GDP storage, vaccines, dairy, fresh produce |
| 0 to +4 °C | Meat, fish and chilled distribution |
| −18 to −25 °C | Frozen food storage and frozen distribution hubs |
| −35 to −40 °C | Blast freezing, IQF tunnels and spiral freezers |
| −70 °C and below | Biologics, clinical trial material and ultra-low pharma |
Budget band cluster
- USD 250K – 750K
- Single or twin cold rooms, a small blast freezer, or a containerised installation with basic backup power.
- USD 750K – 2M
- Multi-zone cold store of roughly 500–1,500 m² with racking, dock doors, a packaged plant and a generator.
- USD 2M – 8M
- Refrigerated warehouse or processing plant refrigeration with NH₃ or CO₂ central plant, redundancy and automation.
- USD 8M – 100M+
- Turnkey distribution hubs, national cold chain programmes and multi-site pharma or export infrastructure.
Ammonia refrigeration RFQ template — copy it or download it
Eight editable sections covering project overview, duty per suction level, architecture and charge, safety and compliance, equipment and controls, utilities, commissioning and commercial terms — plus the required-document checklist every bidder must return with the proposal.
One-click copy
Copy the complete RFQ — all eight input sections and the bidder document checklist — straight into your email, Word document or procurement portal.
- Buyer / operating company: ____________________
- Site address, country and altitude: ____________________
- Facility type (cold store / processing / dairy / beverage / logistics / ice / other): ____________________
- Suction level 1 — duty _______ kW at evaporating _______ °C, serving: ____________________
- Suction level 2 — duty _______ kW at evaporating _______ °C, serving: ____________________
- Suction level 3 — duty _______ kW at evaporating _______ °C, serving: ____________________
- Architecture preference (central plant / low-charge packaged / NH3-CO2 cascade / open): ____________________
- Maximum permitted ammonia charge at the site: _______ kg (regulatory threshold if known: _______ kg)
- Secondary fluid where ammonia must stay in the machine room (glycol / CO2 / none): ____________________
- Design code to be applied (IIAR-2 / EN 378 / ISO 5149 / local equivalent): ____________________
- Process-safety regime (PSM/RMP / Seveso / national equivalent / none confirmed): ____________________
- Pressure-vessel code required (ASME VIII / PED / other): ____________________
- Compressor strategy (screw / reciprocating / open) and staging per suction level: ____________________
- Manufacturer selection printouts required at the stated duty: yes / no
- Part-load performance to be declared at 50% / 70% load: yes / no
- Electrical supply available (voltage / fault level / spare capacity _______ kVA): ____________________
- Standby generator: existing / required — load to hold _______ kW, autonomy _______ hours
- Water supply quality and treatment scope (for evaporative condensers): ____________________
- Pressure and tightness test certificates to be supplied: yes / no
- Safety-device functional test records required: yes / no
- Witnessed performance test at the design point (protocol attached by bidder): yes / no
- Pricing basis (lump sum / schedule of rates / open book): ____________________
- Payment milestones tied to verifiable delivery stages: ____________________
- Warranty duration and conditions: ____________________
Required documents from every bidder
NH3 track record
- Reference list of commissioned ammonia plants with duty, refrigerant charge and year
- At least two references of comparable duty in a comparable climate
- Contactable reference owners willing to take a buyer call
- HFC-to-NH3 conversion references (conversion projects only)
Compliance evidence
- Design-code statement naming IIAR-2 / EN 378 / ISO 5149 as applicable
- Pressure-vessel certification (ASME VIII / PED) for vessels and packages
- Welding procedure specifications and welder qualifications (WPS/PQR)
- Installer and refrigerant-handling licences valid in the project country
Safety design
- Ammonia charge calculation in kg, with the minimisation approach stated
- Detection layout: sensor count, locations, alarm and shutdown setpoints
- Normal and emergency ventilation calculations for the machine room
- Relief-valve sizing basis and discharge routing drawing
- Written commitment to HAZOP participation where required
Performance
- Compressor selection software output at the stated duty and design ambient
- Declared absorbed power and COP at design point and at 50–70% part load
- Annual energy estimate at the buyer's stated tariff and load profile
- Capacity at the design ambient — not nominal catalogue conditions
Execution and commissioning
- Programme from order to mechanical completion and commissioning
- Commissioning plan: pressure test, tightness test, charge procedure
- Performance-test protocol with named acceptance criteria and witness points
- Training plan with duration, language and competency sign-off method
Commercial
- Itemised exclusions list — unlisted items deemed included
- Warranty terms and what voids them
- Service rates, guaranteed response times and local coverage evidence
- Critical spares list with prices and lead times
The template is buyer guidance, not legal or engineering advice. ColdMatch Group is supplier-neutral and does not act as an EPC contractor or equipment manufacturer.
Downloadable ammonia refrigeration project qualification checklist
A fill-in project snapshot plus 31 verification points across code and compliance, ammonia-specific safety, and commissioning and acceptance — followed by the document list to require from every bidder so proposals stay comparable.
- Design code confirmed for the project jurisdiction: IIAR suite (North America) or EN 378 / ISO 5149 (EU and international)
- Pressure equipment certified to ASME VIII or PED 2014/68/EU, with certificates included in the bid
- Welding procedure specifications and welder qualifications to ASME IX or EN ISO 15614 / 9606
- Total ammonia charge stated in kilograms, with a written charge-minimisation rationale
- Low-charge packages or a secondary coolant (glycol / CO2) evaluated for areas with people or open product
- NH3 detection design: sensor locations, alarm setpoints (typ. 25 ppm pre-alarm / 500 ppm emergency) and the automatic actions each level triggers
- P&ID walkdown and as-built drawing verification completed before any charging
- Strength and tightness (pressure / leak) test certificates issued for the complete circuit
- Vacuum and dehydration record documented before refrigerant charging
Documents to require from every bidder
A. NH3 track record
- Reference list of commissioned ammonia plants with duty, year, climate and industry
- Two contactable reference owners of comparable plants (not sales contacts)
- CVs of the design lead and the commissioning engineer named for this project
- Three-year HSE statistics and a sample risk assessment for an occupied site
B. Compliance evidence
- Pressure equipment certificates (ASME / PED) for vessels and packages
- Welding procedure specifications and welder qualification certificates
- Quality assurance plan and inspection & test plan for fabrication and site work
- Contractor licences and insurance certificates covering ammonia work
C. Safety design
- Machine-room ventilation calculation and emergency ventilation interlock description
- Gas detection layout with sensor locations, setpoints and actions
- Ammonia charge calculation per circuit and the minimisation measures applied
- Draft emergency response plan and relief venting arrangement drawing
D. Commissioning submission
- Sample commissioning and acceptance protocol from a comparable plant
- Performance test procedure with measurement points, tolerances and instruments
- Training syllabus and materials for the operator team
- Handover dossier table of contents and recommended two-year spares list
The checklist is buyer guidance, not legal, safety or engineering advice. Always confirm ammonia code requirements with the authority having jurisdiction in the project country.
Move from comparison to quotes
Send one structured request and compare like-for-like offers from qualified suppliers. Free for buyers — ColdMatch is independent and supplier-neutral.
Frequently asked questions
How ColdMatch Group works — independent B2B procurement and sourcing platform — ColdMatch Group is an independent B2B procurement and sourcing platform for industrial refrigeration, cold storage and cold-chain projects from USD $250K+, connecting buyers with qualified third-party suppliers, EPC contractors and independent financing providers.