Pull to refresh
ColdMatch Group — industrial cooling and cold chain procurement platform
ColdMatchGroupMulti-Bid Cold Chain Sourcing
SolutionsIndustriesKnowledge CenterMarketsToolsFinancingLogistics
ColdMatch Group — industrial cooling and cold chain procurement platform
ColdMatchGroup
SolutionsIndustriesKnowledge CenterIntelligence Center & CalculatorsIndustry IntelligenceExecutive Knowledge CenterPlanning CenterEquipment IntelligenceInnovation & TechnologyProcurement AcademyCase StudiesMarkets by CountryTools & CalculatorsCertificationsFind SuppliersFinancingLogisticsGet Free Quotes
DashboardPrepare a Professional RFQ
DashboardSign inPrepare a Professional RFQ
Cold-chain project financing.Financing for qualified cold-chain projects — introduced to independent financing partners.FinancingFinancing Center
Home

Offline — reconnect before saving or submitting. Changes on this page have not been sent.

Two professionals reviewing a clipboard beside an industrial refrigeration compressor installation
← Insights
Planning & Procurement Oct 2026·19 min read

Compare Refrigeration Suppliers: Documented RFQ Scorecard

Compare cold-room suppliers using documented capacity, energy basis, scope, commissioning, service, warranty and acceptance tests—not unsupported claims.

EnglishEspañolPortuguês (Brasil)FrançaisРусскийעבריתالعربية

Original AI-generated editorial illustration; not a customer facility, supplier reference or equipment specification.

Quick answer

Compare cold-room suppliers using documented capacity, energy basis, scope, commissioning, service, warranty and acceptance tests—not unsupported claims. Not necessarily. Energy, maintenance, refrigerant service, spare parts and downtime continue for the life of the plant. Compare lifecycle cost over the same period after confirming equal scope and assumptions.

Key takeaways

  • ▸Is the cheapest refrigeration proposal usually the best value? Not necessarily.
  • ▸What should I check first when comparing cold storage quotations? The design basis: temperatures, product intake, incoming temperature, design ambient, capacity and redundancy.
  • ▸How do I compare energy costs between proposals? Ask each supplier for expected annual consumption and its assumptions, then apply your own tariff in the electricity cost calculator.
  • ▸What should a refrigeration warranty cover? Check parts, labour, travel and refrigerant coverage, when the warranty starts, its conditions, and fault response times, plus who provides local service after handover.

In this article

  1. 01. Which supplier claims require documents before they earn a score?
  2. 02. What acceptance evidence should be agreed before contract award?
  3. 03. What is lifecycle cost in industrial refrigeration?
  4. 04. Why are refrigeration proposals so hard to compare?
  5. 05. Step 1: are all proposals sized for the same duty?
  6. 06. Step 2: is the scope identical?
  7. 07. Step 3: which lifecycle cost lines should you compare?
  8. 08. How do warranty and service scope change the comparison?
  9. 09. Should the refrigerant or system type decide the comparison?
  10. 10. Which cold storage specifications should you compare line by line?
  11. 11. Complete refrigeration RFQ checklist
  12. 12. How to score proposals after normalising them
  13. 13. What should you ask every bidder about controls and service?
  14. 14. What should you do — and avoid?
  15. 15. Which mistakes cost buyers the most?
  16. 16. Illustrative worked example: normalising two bids
  17. 17. Summary
  18. 18. How does ColdMatch help you compare proposals?

Reviewed: Oct 2026 · ColdMatch Group

Direct answer: define the operational result and one common design/scope brief before comparing manufacturers. Apply pass/fail requirements first, then score documented capacity, energy basis, scope, commissioning, support and lifecycle cost. Mark unsupported statements unverified; a brand or low price is not proof of fitness for your site.

> Last reviewed: 15 Oct 2026 · Prepared by: the ColdMatch Group editorial team · buyer education only; not signed off by a licensed refrigeration engineer.

> Who this guide is for: buyers, engineers and operators planning commercial or industrial refrigeration — cold rooms, cold stores, pre-cooling, freezing and process cooling. It does not cover household fridges, home freezers or appliance repair.

Which supplier claims require documents before they earn a score?

Use one row per requirement and one column per proposal. Record requirement, supplier response, document/revision, evidence status, exception and reviewer. Set mandatory gates and buyer-chosen weights before comparing prices; do not invent universal weights or substitute a score for engineering approval. Unknown evidence stays unverified, not compliant. First clarify discrepancies through the ColdMatch team when using managed procurement.

CriterionClaim to separate from proofDocument or test to request
Capacity at design conditionsNominal kW or brand reputationLoad breakdown and selection at stated product, ambient, evaporating and condensing conditions
Temperature uniformity and pull-down“Stable temperature”Loaded mapping protocol, sensor calibration, agreed tolerances and pull-down test
Energy basis“Energy efficient”Annual kWh model or comparable test data with load profile, ambient, auxiliaries and defrost
Equipment and installation scope“Turnkey”Itemised bill of scope, exclusions, contractor interfaces and commissioning responsibilities
Controls and monitoring“Smart controls”Control sequence, sensor plan, alarm/escalation tests and records/export capability
Spares and local service“Global support”Critical spares list, location/lead-time confirmation and written local response commitment
Warranty“Full warranty”Contract wording for parts, labour, travel, refrigerant, start date and exclusions
ReferencesNamed logo or anecdotePermission-based comparable-project documentation; distinguish supplier statements from independently checked evidence
Lifecycle cost“Lowest total cost”Same period, scope, currency, tariff, service/replacement basis and explicit uncertainties
Acceptance“Ready to operate”Agreed test plan, witnessed results, defects list, training and as-built handover

What acceptance evidence should be agreed before contract award?

Specify representative loading, product and ambient conditions, instruments, duration, responsible witnesses and pass/fail criteria with qualified engineering and quality personnel. Include temperature mapping, pull-down where required, alarms, defrost and safe power-loss/restart tests. Agree how deviations are corrected and retested. The ASHRAE commissioning resource describes a requirements-led process; it is not a ColdMatch certification. Request drawings, settings, manuals, maintenance/spares lists and operator training. No manufacturer performance, availability, local service or reference is verified by this article.

Source scope: FAO's 2026 news article explains cold-chain policy; the 2022 FAO/UNEP report and 2015 regional agriculture brief provide strategic context, not a universal design manual. They do not establish a loss rate, equipment saving or temperature for your product. ASHRAE's official resource page identifies a commissioning framework; detailed procedures require the guide and qualified review. FAO 2026; FAO/UNEP 2022; FAO 2015.

What is lifecycle cost in industrial refrigeration?

Lifecycle cost (also called total cost of ownership) is the sum of what a system costs to buy, install, run, maintain and eventually replace or decommission over a chosen period. For refrigeration, running and maintenance costs continue for every year the plant operates, so differences in efficiency, reliability and serviceability can outweigh a gap in the initial price. ColdMatch's article on cheapest refrigeration versus lifetime cost explains the principle; this guide shows how to apply it to real proposals.

Why are refrigeration proposals so hard to compare?

Because each supplier fills gaps in the brief differently. One assumes a lower ambient temperature, another a smaller daily intake; one includes electrical works and commissioning, another excludes them; one quotes a two-year warranty on parts and labour, another one year on parts only. Read hidden costs in cold storage quotations for the lines that most often go missing.

Step 1: are all proposals sized for the same duty?

Before looking at price, put each supplier's design basis side by side. If these differ, ask the supplier to re-quote on the common basis rather than adjusting numbers yourself.

Design assumptionWhat to check in each proposal
Room temperatures and humiditySame set points and tolerances as your brief
Product intake and incoming temperatureSame daily quantity and starting temperature
Design ambient temperatureSame hot-day condition for condensers
Refrigeration capacity per roomStated in kW at stated conditions, with safety margin explained
Running hours and defrostAssumed compressor run time and defrost method
RedundancyNumber of circuits or compressors and what happens if one fails
Door traffic and infiltrationAssumed openings and door protection

If you have not fixed these values yet, the refrigeration load calculator helps you test them; its result is a planning estimate, not a design.

Step 2: is the scope identical?

List every scope item and mark each proposal *included*, *excluded* or *unclear*. Typical lines: insulated panels and doors, refrigeration equipment, piping and refrigerant charge, controls and monitoring, electrical panels and cabling, civil works and floor insulation, transport and duties, installation, commissioning, training, documentation, spare parts, and post-handover support. Every *unclear* becomes a written question to the supplier.

Step 3: which lifecycle cost lines should you compare?

Cost lineWhat to ask forHow to compare
CAPEXPrice for the identical scope, delivery terms, payment scheduleSame scope, same currency and terms
EnergyExpected annual consumption (kWh) with the assumptions behind itApply your own tariff in the electricity cost calculator
MaintenanceRecommended schedule, typical annual service scopeAsk for the content of a service visit, not only its price
Refrigerant and serviceRefrigerant type and charge, leak checks, local technician availabilityCheck rules at your site with a local engineer
Spare partsCritical spares list, lead times, local stockCompare availability, not only cost
Downtime riskRedundancy, response time, remote monitoringEstimate what an outage would cost you in product and operations
End of lifeExpected service life of main componentsUse the same comparison period for all

Use the electricity cost calculator to convert each supplier's stated consumption into an annual energy cost at your tariff. If a supplier does not state consumption and its basis, ask for it; an undisclosed assumption cannot be compared.

How do warranty and service scope change the comparison?

Two warranties with the same length can be very different. Compare what is covered (parts, labour, travel, refrigerant), from when (delivery, commissioning or acceptance), the conditions (approved maintenance, original parts) and the response time for faults. Ask who will service the plant locally after handover and how quickly they can attend. A strong service arrangement reduces downtime risk, which belongs in the lifecycle comparison even though it rarely appears as a price line.

Should the refrigerant or system type decide the comparison?

Not on its own. Different refrigerants and system types suit different capacities, climates, skills and rules, and requirements change over time in many jurisdictions. Ask each supplier to explain why their choice fits your site, what it means for service and future compliance, and what safety measures it requires. A qualified local engineer should review the shortlisted designs against the regulations that apply to you before contract award.

Which cold storage specifications should you compare line by line?

Before choosing a system, put these specifications side by side for every proposal. The right column lists what a qualified engineer should confirm — a buyer can collect and compare the data, but cannot sign off the design. The free technical specification builder and proposal comparison matrix help you organise them.

SpecificationWhat to compareConfirm with a qualified engineer
Capacity and throughputPallet positions or tonnes, daily intake, pull-down timeLoad calculation and peak-day sizing
Temperature rangeSet points, tolerance, humidity, number of zonesSuitability for each product
InsulationPanel type and thickness, floor insulation, doors and sealsThermal performance, condensation and floor-heave risk
Refrigeration configurationRefrigerant, system type, number of circuits, standby capacitySafety, local rules and redundancy
Energy assumptionsAnnual kWh, ambient basis, running hoursWhether assumptions match your site
Controls and monitoringController, alarms, data logging, remote accessAlarm logic and any regulatory records
Maintenance and serviceabilityService plan, access to components, local technicians, sparesMaintainability of the layout
Installation and commissioningScope, interfaces, tests, acceptance criteria, documentationTest procedures and acceptance values
WarrantyCoverage, start date, conditions, response timesFit with the maintenance plan
Total costCAPEX plus energy, maintenance, refrigerant and downtime over one periodLifecycle assumptions used

Then convert each offer into a total cost over the same period with the refrigeration TCO calculator. All results are planning estimates, not quotes.

Complete refrigeration RFQ checklist

Include these items in your request so every supplier answers the same questions. The ColdMatch cold storage RFQ checklist gives a printable version.

  • Project summary: products, sectors, site country and region, schedule.
  • Duty: temperatures, humidity, daily intake, incoming temperature, storage duration.
  • Site: peak ambient conditions, available space, building status, access.
  • Capacity: pallet positions or tonnes, layout sketch, growth case.
  • Utilities: power supply, outage pattern, water, required backup and redundancy.
  • Constraints: refrigerant or energy requirements, local service availability, applicable regulations for local review.
  • Scope: list of included items and interfaces with other contractors.
  • Requested answers: capacity at stated conditions, annual energy estimate and basis, maintenance plan, spare parts list, warranty terms, response times, delivery and installation schedule, commissioning and acceptance tests, documentation and training.
  • Commercial: price breakdown, currency, delivery terms, payment schedule, validity period.

How to score proposals after normalising them

Agree weights before opening prices — for example technical fit, lifecycle cost, delivery schedule, service and support, and risk — then score each proposal against the same criteria. Record why each score was given. Procedures such as these are consistent with the value-for-money approach described in public procurement guidance like the World Bank Procurement Framework, even for private buyers.

What should you ask every bidder about controls and service?

  • Which controller and monitoring platform is offered, who owns the data and can it be exported?
  • Which alarms are included, who receives them and how is escalation tested at handover?
  • What is the planned maintenance schedule and the content of each visit?
  • Who services the plant locally, what is the guaranteed response time and which critical spares are stocked locally?
  • What training and documentation (as-built drawings, settings, manuals) are delivered?

What should you do — and avoid?

  • Do normalise duty, scope and assumptions before comparing prices.
  • Do apply your own tariff and running hours to each stated energy figure.
  • Do compare over one period and one currency.
  • Avoid comparing headline prices with different exclusions.
  • Avoid scoring claims that have no supporting document.

Which mistakes cost buyers the most?

MistakeConsequencePrevention
Choosing the lowest CAPEX onlyHigher running and repair costsCompare lifecycle cost
Energy figures without assumptionsUncomparable numbersRequire kWh/year with its basis
Service scope left vagueSlow response, long outagesWritten response time and spares list
Controls treated as an extraNo records, weak alarmsMake monitoring and alarms a quoted line

Illustrative worked example: normalising two bids

*Illustrative only — invented figures to show the method, not market prices or real suppliers.* Assumptions: two bids for the same cold store. Bid A: purchase price 1.00 M (currency units), stated energy 400 MWh/year, one-year parts-only warranty, controls excluded. Bid B: purchase price 1.10 M, stated energy 340 MWh/year, two-year parts-and-labour warranty, controls and monitoring included. Your tariff: 0.15 per kWh; comparison period 10 years; no discounting for simplicity. Normalise: add the price of controls to A (say 0.05 M, obtained by asking the bidder). Energy over 10 years: A = 400,000 kWh × 0.15 × 10 = 0.60 M; B = 340,000 × 0.15 × 10 = 0.51 M. Subtotal: A = 1.00 + 0.05 + 0.60 = 1.65 M; B = 1.10 + 0.51 = 1.61 M — before maintenance, warranty difference and downtime risk. The result can reverse with a different tariff, running hours or financing cost; the method, not the winner, is the point. Use the refrigeration TCO calculator with your own figures.

Summary

  • Same duty, same scope, same assumptions — then compare.
  • Convert every stated energy figure into cost at your tariff.
  • Compare controls, service, spares and warranty in writing.
  • Use one period and currency for lifecycle cost.
  • Ask a qualified engineer to review the shortlist before award.

How does ColdMatch help you compare proposals?

After defining the product, route, capacity, temperatures, site and operating outcome, you may optionally prepare an RFQ. ColdMatch reviews the request, coordinates suitable supplier outreach and organises responses for comparison; there is no direct buyer-to-supplier handoff. Buyer procurement is free, with typical USD 250K+ commercial B2B scope. ColdMatch does not manufacture, install or lend and guarantees no savings, performance, availability or approval. Any later exploration of independent external financing is optional and requires consent; no request is automatically sent to a bank or supplier. You can use this checklist without submitting anything.

*Prepared by the ColdMatch Group editorial team. Calculator methods are documented in our calculator methodology. Last reviewed: 12 October 2026.*

Turn this guidance into a refrigeration brief for ColdMatch review and organised supplier responses. ColdMatch is supplier-neutral and free for buyers. For industrial projects from USD 250,000, the team qualifies the brief, contacts suitable suppliers on your behalf and presents organised responses; no automatic supplier connection.

Start a structured industrial refrigeration RFQ

Run the numbers

Calculators for this project type

Indicative planning figures only — final sizing belongs to the supplier's or consultant's detailed design.

Refrigeration sizing

Fruit & vegetable cold storage ROI calculator

Pre-cooling and storage capacity plus indicative payback from spoilage reduction.

Energy & backup power

Energy & backup power cost calculator

Annual energy spend from load and running hours, plus the cost of generator hours during outages.

Related solutions
Generators & Backup Power Solar Backup Power Industrial Refrigeration Systems All solutions
Turn these numbers into a packhouse cold storage RFQ Free for buyers · Supplier-neutral · One scope to several suppliers
Request a quote

Frequently asked questions

Plan the numbers before you send an RFQ

The reference pages buyers use most before requesting quotes.

Cold room cost guideUSD/m³ and USD/pallet benchmarks by temperature class.Cold storage construction cost guideCAPEX breakdown: envelope, refrigeration, racking, civil works.Refrigerant phase-out guideF-gas / Kigali timelines and NH3, CO2 and HFO options.Cold storage calculatorSize the room, load and energy spend in under two minutes.Project financingLease, term and export-credit structures for cold chain CAPEX.RFQ BuilderOne structured RFQ to qualified suppliers and EPCs.

In this article

  1. Which supplier claims require documents before they earn a score?
  2. What acceptance evidence should be agreed before contract award?
  3. What is lifecycle cost in industrial refrigeration?
  4. Why are refrigeration proposals so hard to compare?
  5. Step 1: are all proposals sized for the same duty?
  6. Step 2: is the scope identical?
  7. Step 3: which lifecycle cost lines should you compare?
  8. How do warranty and service scope change the comparison?
  9. Should the refrigerant or system type decide the comparison?
  10. Which cold storage specifications should you compare line by line?
  11. Complete refrigeration RFQ checklist
  12. How to score proposals after normalising them
  13. What should you ask every bidder about controls and service?
  14. What should you do — and avoid?
  15. Which mistakes cost buyers the most?
  16. Illustrative worked example: normalising two bids
  17. Summary
  18. How does ColdMatch help you compare proposals?

Planning a project?

One brief, reviewed by a specialist, compared across qualified suppliers.

Start your project

Related insights

Planning & Procurement

Free Tools to Size and Compare Cold Storage

Use ColdMatch's free calculators to plan cold room capacity, cooling load, refrigeration energy cost and lifecycle cost, then compare complete proposals.

Planning & Procurement

Cold-Room Sizing and Total Operating Cost: Buyer Guide

Size a cold room from product, peak throughput and holding time; compare cooling duty, energy, maintenance and backup at documented design conditions.

UAE & GCC

Industrial Refrigeration UAE: Specify, Then Buy

Buying a cold room or refrigeration plant in Dubai, Abu Dhabi or Sharjah? Specify capacity, temperature, redundancy, energy and commissioning first, then compare like-for-like quotes.

Planning & Procurement

Designing a Reliable Produce Cold Chain

Commodity-specific temperature management, pre-cooling, airflow, monitoring and backup for produce — with a transparent cold-room requirement checklist.

Planning & Procurement

Choosing Cold-Chain Equipment for Food and Farm Products

Match industrial refrigeration equipment to each food or farm product: pre-cooling, freezing, zones, humidity, ripening and questions to answer before quotes.

Planning & Procurement

How to Reduce Cold-Chain Losses: Plan Around Risk

Plan refrigeration procurement around product needs, load profile, route stages, ambient heat, monitoring and backup power to cut avoidable cold-chain losses.

Project request

Submit your project for expert review

Send your requirements. A ColdMatch specialist reviews every request, prepares a brief and introduces qualified suppliers — free for qualified buyers.

ColdMatch Group — industrial cooling and cold chain procurement platform
ColdMatchGroup

Because we care more.

ColdMatch Group is the industrial refrigeration and cold-chain procurement platform of Global B2B Group, where commercial and industrial buyers build a project and submit an RFQ; the ColdMatch team validates and organizes it, contacts suitable refrigeration technology and equipment suppliers on the buyer's behalf, and presents organized responses through ColdMatch.

support@coldmatchgroup.com
Follow on LinkedIn
Language
Sourcing & Financing
  • Get Free Quotes
  • RFQ Builder
  • Urgent Procurement
  • Solutions
  • Suppliers
  • Refrigeration Marketplace
  • Global Coverage
  • Project Financing
  • Financing Center
Tools & Knowledge
  • Planning Center
  • Calculators
  • Innovation & Technology
  • Projects Hub
  • Knowledge Hub
  • Cold Chain Answers
  • Cost Benchmarks 2026
  • AI Agents (MCP)
Markets
  • All Country Markets
  • Zambia
  • Ghana
  • Malawi
  • Kenya
  • Nigeria
  • Mauritius
  • Israel
  • Finland
  • Hungary
Company
  • About ColdMatch
  • How ColdMatch Works
  • Solutions by Buyer Type
  • Consultant Partner Program
  • Supplier Qualification
  • Trust Center
  • Case Studies
  • Blog
  • Contact
Sourcing & Financing
  • Get Free Quotes
  • RFQ Builder
  • Urgent Procurement
  • Solutions
  • Suppliers
  • Refrigeration Marketplace
  • Global Coverage
  • Project Financing
  • Financing Center
Tools & Knowledge
  • Planning Center
  • Calculators
  • Innovation & Technology
  • Projects Hub
  • Knowledge Hub
  • Cold Chain Answers
  • Cost Benchmarks 2026
  • AI Agents (MCP)
Markets
  • All Country Markets
  • Zambia
  • Ghana
  • Malawi
  • Kenya
  • Nigeria
  • Mauritius
  • Israel
  • Finland
  • Hungary
Company
  • About ColdMatch
  • How ColdMatch Works
  • Solutions by Buyer Type
  • Consultant Partner Program
  • Supplier Qualification
  • Trust Center
  • Case Studies
  • Blog
  • Contact
Business and supplier disclaimer

ColdMatch Group is the industrial refrigeration and cold-chain procurement platform of Global B2B Group, where commercial and industrial buyers build a project and submit an RFQ; the ColdMatch team validates and organizes it, contacts suitable refrigeration technology and equipment suppliers on the buyer's behalf, and presents organized responses through ColdMatch. It helps buyers prepare technical requirements and structured RFQs before suitable third-party suppliers, manufacturers, EPC contractors and turnkey providers are introduced manually. ColdMatch is not an equipment manufacturer, reseller, distributor, EPC contractor, installer, insurer, lender, bank or financial advisor, and is not a party to any supply, construction or finance contract. Quotes, equipment and services are provided solely by the matched third-party supplier, who is solely responsible for quality, delivery, installation, safety and performance. ColdMatch makes no guarantee of availability, price, quality or approval and disclaims all liability for any service provided by a supplier or other third party. See Terms and How ColdMatch Works.

Financing disclaimer: ColdMatch does not provide or guarantee finance. Any financing pathway is evaluated and supplied solely by independent third-party providers under their own checks and terms. See Terms.

ColdMatch Group is the industrial refrigeration and cold-chain procurement platform of Global B2B Group, where commercial and industrial buyers build a project and submit an RFQ; the ColdMatch team validates and organizes it, contacts suitable refrigeration technology and equipment suppliers on the buyer's behalf, and presents organized responses through ColdMatch. It helps buyers prepare technical requirements and structured RFQs before suitable third-party suppliers, manufacturers, EPC contractors and turnkey providers are introduced manually. ColdMatch is not an equipment manufacturer, reseller, distributor, EPC contractor, installer, insurer, lender, bank or financial advisor, and is not a party to any supply, construction or finance contract. Quotes, equipment and services are provided solely by the matched third-party supplier, who is solely responsible for quality, delivery, installation, safety and performance. ColdMatch makes no guarantee of availability, price, quality or approval and disclaims all liability for any service provided by a supplier or other third party. See Terms and How ColdMatch Works.

Disclaimer: ColdMatch Group is the specialized industrial refrigeration and cold-chain procurement platform of Global B2B Group. ColdMatch Group is not a manufacturer, reseller, distributor, EPC contractor, installer, insurer, lender, bank, credit provider, financial advisor, investment advisor, underwriter or regulated financial services provider. Any financing, leasing, trade finance, working capital or project-finance option mentioned on this website is provided solely by independent third-party financing providers, subject to their own eligibility checks, KYC, due diligence, compliance review, approval, terms and documentation. ColdMatch Group does not provide financial advice, does not arrange regulated financial products, does not guarantee financing approval, and is not responsible for any financing decision, offer, rejection, delay, cost, term or outcome. Quotes, equipment, services, delivery, installation, commissioning, warranties and project performance are provided solely by independent third-party suppliers, EPC contractors or service providers. See Terms.

ColdMatch Group · Global Refrigeration & Cold-Chain Sourcing
How ColdMatch Works·Cold Chain Project Markets·Project Guide·RFQ Process·AI Agent Brief·For AI Cold Chain & Refrigeration Procurement Agents·Supplier Qualification·Trust Center·Legal Center·Terms of Service·Privacy Policy·Agency Policy·Contact·Client Login (Buyer Portal)·Accessibility·Accessibility Support
Legal Documents
Terms of Service·Privacy Policy·Agency Policy·Cookie Policy·General Disclaimer·Legal Notice·RFQ Terms·Buyer Terms·Supplier Terms·Financing Disclaimer·Acceptable Use Policy·Marketplace Rules·Intellectual Property & Copyright Policy·Data Protection & GDPR·AML, Sanctions, Export & Anti-Bribery Policy·Cyber Security & Responsible Disclosure·AI & Third-Party Content Disclaimer
EnglishالعربيةעבריתPortuguêsPortuguês (Brasil)РусскийSuomiMagyarTürkçe
Operated from the Republic of Cyprus · We are committed to WCAG 2.1 AA accessibility — report barriers to accessibility@coldmatchgroup.com.© 2026 ColdMatch Group · All rights reserved.ColdMatch Group is the specialized commercial cold-chain platform of Global B2B Group — a global B2B procurement & project development ecosystem. Sister platforms: FishMatch Group, HatchMatch Group, FeedMatch Group, SeedMatch Group. About ColdMatch Group.ColdMatch helps buyers prepare cold chain RFQs and source suitable suppliers. Supplier matching and introductions are managed manually by ColdMatch — not an automatic marketplace. How it works.
CalculatorsGuidesFinancingGet a Quote

Get updates

Cold-chain reading, project resources and technology evidence.