Project Intelligence · Flagship Tool
Cold Chain Infrastructure Builder
Answer a few project questions and instantly generate the complete infrastructure package: a phased roadmap, equipment and documentation checklist, recommended supplier categories, procurement phases and a ready-to-send RFQ. Independent — no supplier lock-in.
Preset loaded: Solar Cold Storage Builder — PV + battery + high-efficiency refrigeration for off-grid or grid-hybrid sites.
Change verticalProject inputs
Network nodes to include
Project roadmap
- 1Kick-off, site survey, refrigerant decisionMonth 0–2 · owner: Advisor
- 2FEED closed, RFQs issued to shortlisted suppliersMonth 2–4 · owner: Buyer
- 3Award refrigeration + long-lead equipmentMonth 4–6 · owner: Buyer
- 4Civil works + panel installationMonth 6–14 · owner: EPC
- 5Refrigeration install, FAT/SAT, pull-downMonth 12–18 · owner: Supplier
- 6Load-in, WMS go-live, operational handoverMonth 16–20 · owner: Buyer
Infrastructure checklist (10)
- PU/PIR insulated wall & roof panels sized to target U-valueenvelope
- Vapor-tight envelope, expansion joints and cold-side floor heatingenvelope
- Insulated cold-store doors, strip curtains and air-curtainsenvelope
- Refrigeration plant sized for peak load — refrigerant: HFOequipment
- Evaporators, condensers/gas coolers, pumps and safety valvesequipment
- Refrigeration controls, alarms and remote monitoringcontrols
- Solar PV + battery buffer to offset diesel/grid OPEXequipment
- Independent commissioning + FAT/SAT witness plandocumentation
- Turnover documentation: O&M manuals, as-builts, spares listdocumentation
- Backup power (genset) sized for refrigeration hold-overequipment
Recommended supplier categories (7)
Insulated panel & envelope contractor
PU/PIR panels, vapor barriers, floors, doors
Lead time ~10–18 weeks
Civil / structural contractor
Site works, slab, structure, drainage
Lead time ~12–28 weeks
Low-GWP HFO / HFC refrigeration
Packaged chillers, DX systems, VRF
Lead time ~12–22 weeks
MEP / electrical contractor
HV/LV, backup gensets, HVAC, plumbing
Lead time ~14–24 weeks
Solar + storage EPC
PV, batteries, hybrid inverters for cold facilities
Lead time ~14–26 weeks
Independent commissioning agent
FAT/SAT witness, pull-down, performance handover
Lead time ~6–12 weeks
Turnkey cold-chain EPC
Design–build wrap of civil + refrigeration + MEP
Lead time ~26–44 weeks
Procurement phases
Phase 1 — Scope & FEED
Weeks 0–8
Deliverables: Concept design · Load & capacity calc · Refrigerant selection · Scope of Work v1
Suppliers: Advisor / owner's engineer
Phase 2 — Long-lead RFQs
Weeks 6–14
Deliverables: Refrigeration plant RFQ · ASRS/IQF RFQ (if applicable) · Panel & envelope RFQ
Suppliers: Insulated panel & envelope contractor · Low-GWP HFO / HFC refrigeration
Phase 3 — Civil & MEP procurement
Weeks 12–22
Deliverables: Civil contractor award · MEP contractor award · Backup power & solar (if applicable)
Suppliers: Civil / structural contractor · MEP / electrical contractor · Solar + storage EPC
Phase 4 — Integration & commissioning
Weeks 20–44
Deliverables: Install & tie-in · WMS/BMS integration · FAT/SAT · Performance handover
Suppliers: Independent commissioning agent
RFQ package
Cold-chain infrastructure package — food-distribution — 2 network node(s), manual automation, HFO refrigeration.
Industry: food-distribution Selected nodes: production, cold-storage Automation: manual Refrigerant preference: hfo Target capacity: ~500 pallets Timeline: 12–24 months Budget: USD 250K – 1M Country: Nigeria Generated by Cold Chain Infrastructure Builder.
ColdMatch Group is an independent procurement platform. Recommendations here are directional and based on your inputs — final scope, refrigerant selection and vendor shortlists are confirmed during FEED with a qualified engineer.