Insulated panels for cold storage — PU, PIR, mineral wool and IPN
PU, PIR, mineral wool and IPN sandwich panels 80–200 mm for chilled, frozen and deep-freeze envelopes. ColdMatch runs a vendor-neutral RFQ across audited panel manufacturers — benchmarking U-value, fire class (B-s2,d0 / EI), thickness, span, cam-lock joints and delivered price per m².
- PU, PIR, mineral wool and IPN cores 80–200 mm
- Fire ratings EI 30 / EI 60 / EI 120 and B-s2,d0
- Cam-lock, hook-lock and adhesive-bond joints
- Chilled, frozen and deep-freeze envelope design
Panel buying guides
Panel applications
Insulated Sandwich Panels — frequently asked
What panel thickness for a freezer room?
For –18 to –25 °C use 150–200 mm PIR; for deep-freeze –28 to –30 °C or hot climates use 200 mm. Chilled rooms typically 80–120 mm.
PU or PIR?
PIR is the default for cold storage — same thermal conductivity as PU (~0.022 W/m·K) but far better fire class (B-s2,d0) and self-extinguishing behaviour. PU is cheaper but rarely accepted by insurers for large stores.
What fire rating do insurers require?
Most European and GCC insurers now require B-s2,d0 core and EI 30 to EI 60 wall assemblies. FM Global 4880 approval is the benchmark for large distribution centres.
How fast can ColdMatch source panels?
Standard PIR ranges quote in 1–2 weeks and deliver in 4–8 weeks. Custom colours, large widths or specialised fire assemblies add 2–4 weeks.
Next steps for your insulated sandwich panels project
Plan the insulated sandwich panels project before choosing suppliers
Complete cold-chain outcomes depend on planning, budget realism, timeline discipline and neutral bid comparison — not on picking equipment first.
Project planning checklist
Cover the fundamentals before you brief suppliers.
- ·Define capacity, temperature bands and throughput
- ·Confirm site, power, water and permits
- ·Choose refrigerant strategy and automation level
- ·Set redundancy, monitoring and validation targets
- ·List required certifications (GDP, HACCP, BRC, ISO)
- ·Agree budget envelope and financing route
Budget factors
What actually moves the number on a commercial cold-chain project.
- ·Refrigeration plant + refrigerant choice
- ·Panels, envelope, floors, doors and structure
- ·Racking, MHE and automation level
- ·Controls, monitoring, alarms and BMS
- ·Redundancy (N, N+1, 2N) and validation
- ·Country, logistics, duties and installation labour
Typical project timeline
Rule-of-thumb schedule for a commercial cold-chain project.
- FEED, scope, RFQ2–4 months
- Bid review, contracting1–2 months
- Procurement + long-lead3–6 months
- Civils, installation4–10 months
- Commissioning, validation1–3 months
Common mistakes to avoid
Recurring patterns across hundreds of cold-chain briefs.
- ·Buying equipment before defining the project
- ·Under-sizing refrigeration load and standby
- ·Skipping commissioning, validation and training
- ·Single-source without a neutral bid comparison
- ·Ignoring refrigerant regulation and phase-out
- ·Treating financing as an afterthought
Continue the insulated sandwich panels project
ColdMatch Group is the specialized cold-chain platform of Global B2B Group — the worldwide B2B procurement and project ecosystem.
One structured RFQ, vendor-neutral to shortlisted suppliers. Prefilled with pillar context — you refine the details. No commitment, no fees.