Industrial Refrigeration Contractors — Design, Install, Retrofit & Service

Match with vetted industrial refrigeration EPCs and mechanical contractors for ammonia (NH3), CO2 (R744) and HFC plants. From 100 kW food-processing chillers to 20 MW cold storage complexes — 2–4 comparable bids in weeks, not months.

Why source with ColdMatch

Certified & insured

IIAR, RETA, ISO 9001/45001, PED and local pressure-vessel codes verified before shortlist.

All refrigerants

NH3, CO2 transcritical, CO2/NH3 cascade, HFC and low-GWP HFO — matched to your safety envelope.

40+ countries

Regional coverage in NA, EU, MENA, Africa, LATAM and APAC with local service arms.

Energy-first design

Variable-speed compressors, floating condensing, heat recovery — 20–40% OPEX reduction over baseline.

Comparable bids

Common spec structure so proposals are apples-to-apples on CAPEX, kW/TR, warranty and 20-year OPEX.

Turnkey scope

Design, procurement, piping, insulation, controls, commissioning, training and PPM under one contract.

Safety program review

PSM/RMP, LOTO, machinery-room ventilation, ammonia detection and emergency response validated per project.

Retrofits & phase-outs

R-22 replacements, HFC-to-natural transitions, heat-recovery upgrades with 3–7 year paybacks.

Typical specifications we source

Cooling capacity
100 kW – 20 MW+ (30 TR – 5,700 TR)
Refrigerants
NH3, CO2 (transcritical/cascade), R-449A, R-513A, R-1234ze
Applications
Cold storage, food processing, dairy, brewery, pharma, ice rinks, blast freezing, IQF
Codes & standards
IIAR 2/6/9, ASHRAE 15, ASME B31.5, PED, EN 378, OSHA PSM
Delivery model
EPC turnkey, design-build, design-bid-build, retrofit
Service
12–36 mo warranty + PPM + 24/7 emergency contracts

Frequently asked

What does an industrial refrigeration contractor do?+

A qualified contractor engineers, installs, commissions and services large refrigeration plants (typically >100 kW cooling) for cold storage, food processing, dairies, breweries, pharma and ice rinks. Scope covers compressor packs, condensers, evaporators, valves, controls, piping, insulation and safety systems — under a single accountable EPC or design-build contract.

How do I know a contractor can handle ammonia (NH3) safely?+

Ask for RETA, IIAR CIRO/CARO or equivalent certifications, PSM/RMP documentation, insurance limits, safety record and reference projects of similar tonnage. ColdMatch shortlists only contractors with a documented safety program and current NH3 project references.

What's a typical bid timeline?+

For a 500–2,000 TR project, expect 3–5 weeks from RFQ to comparable proposals. ColdMatch structures the RFQ with a common spec so bids are directly comparable on CAPEX, refrigerant charge, kW/TR efficiency, warranty and lifecycle service cost.

Do contractors handle retrofits and refrigerant transitions?+

Yes — HFC-to-NH3, HFC-to-CO2, R-22 phase-out and heat-recovery retrofits are core deliverables. Payback typically lands 3–7 years driven by energy savings and refrigerant compliance.

Is ongoing service included?+

Most contractors bundle 12–36 months warranty plus optional PPM (planned preventative maintenance) and 24/7 emergency service contracts. We surface the full OPEX line-item in the bid comparison.

What certifications should a contractor hold?+

ISO 9001, ISO 45001, IIAR standards for ammonia, ASME B31.5 piping, PED (EU), applicable local pressure-vessel codes, and F-Gas or equivalent refrigerant handling licenses.

How does ColdMatch shortlist contractors?+

We screen for tonnage experience, refrigerant qualification, safety record, financial stability, in-country coverage and post-installation service. Only 3–5 contractors receive your RFQ so each gets serious engineering time.

Get matched with vetted suppliers

One RFQ — multiple competitive quotes from manufacturers, EPC contractors and turnkey providers worldwide.

Start Free RFQ