Quick answer
According to APEDA's circular of 13 May 2026, Vietnam granted market access for fresh Indian grapes effective 6 May 2026, under a systems approach and in-transit cold treatment at a pulp temperature of 1.1 °C for 15 consecutive days. The reefer container therefore becomes the treatment chamber. The detailed Phytosanitary Import Requirement attached to the circular was not reviewed here, so registration, probe, document and packaging rules must be confirmed before you specify equipment.
Key takeaways
- When did Vietnam open its market to Indian grapes? According to APEDA's circular of 13 May 2026, access was granted effective 6 May 2026, following a letter from Vietnam's Plant Production and Protection Department dated 28 April 2026.
- What cold treatment does Vietnam require for Indian grapes? In-transit cold treatment at a pulp temperature of 1.1 °C for 15 consecutive days, together with a systems approach (APEDA circular, 13 May 2026).
- Why does pre-cooling matter if the treatment happens in transit? The treatment period is counted at the treatment pulp temperature.
- What is still unknown about this lane? The attached Phytosanitary Import Requirement was not reviewed here, so systems-approach measures, registration, monitoring, documents and packaging must be confirmed with APEDA or India's plant protection organisation.
Reviewed: 2026-10-25 · ColdMatch Group
Edition note — 25 October 2026. By the ColdMatch Group editorial team. Part of the export-corridor series with South African cherries to China and Canadian seafood to Vietnam, Oman and Armenia. This is general buyer guidance, not legal, regulatory, phytosanitary or engineering advice. ColdMatch does not buy, sell or export grapes or other produce, does not operate or book transport, does not certify treatments and holds no contracts on this lane.
The new access condition puts the cold treatment inside the voyage. If the grape pulp does not stay at the treatment temperature for 15 consecutive days in the container, the treatment requirement is not met. That shifts the risk upstream: grapes need to reach treatment temperature before loading rather than cool down slowly in the container, so packhouse pre-cooling, cold storage and loading practice decide whether a shipment can start its treatment on time.
Status at a glance (checked 25 October 2026)
| Item | What the source says | Status |
|---|---|---|
| Market access | Vietnam's Plant Production and Protection Department granted access for fresh grapes from India effective 6 May 2026, after a letter dated 28 April 2026 (APEDA circular, 13 May 2026) | Published rule |
| Treatment | In-transit cold treatment at a pulp temperature of 1.1 °C for 15 consecutive days (APEDA circular) | Published rule |
| Systems approach | Exports are subject to a systems approach; its measures are not listed in the circular | Rule — details to confirm |
| Detailed requirements | Exports must follow the final Phytosanitary Import Requirement (PIR) attached to the circular; not reviewed for this guide | Unknown — confirm |
| Shipments | APEDA asks interested exporters to comply; no shipment data is given | Unknown — confirm |
Temperature and treatment requirements in the APEDA circular
| Measure | Fruit-pulp temperature | Duration | Where |
|---|---|---|---|
| Cold treatment | 1.1 °C | 15 consecutive days | In transit |
| Systems approach | Not stated in the circular | Not stated | At origin (details in the PIR) |
The circular states no storage temperature or humidity for grapes outside treatment, no pre-cooling method or time, and no probe, calibration or record rules. Those may be set in the PIR. Do not borrow figures from other markets' protocols: obtain the PIR from APEDA or India's plant protection organisation and let your postharvest technologist set the rest.
The cold-chain problem to solve
Because the treatment runs in transit, the equipment question splits in two. At origin, the packhouse needs enough pre-cooling and cold storage to bring each lot to treatment temperature and hold it until the container is loaded at harvest peak. In transit, the shipping line's reefer and its probes must hold and record the pulp temperature for 15 consecutive days. A weak link at either end — warm fruit at loading, a poorly placed probe, a missing record — can put the treatment, and the shipment, at risk.
Questions to put in a cold-chain RFQ
Pre-cooling
- What pre-cooling capacity is offered for the harvest-day peak, and how long does it take to bring grapes from field temperature to the loading temperature you specify?
- Which pre-cooling method is proposed for your packaging, and how is pulp temperature measured and recorded before loading?
- How will the system handle the systems-approach measures once you have confirmed them in the PIR?
Cold storage
- How many pallet positions are needed to hold pre-cooled grapes until container loading at peak?
- What storage temperature and humidity will your postharvest technologist specify? (Not stated in the circular.)
- How are loading docks arranged so fruit does not warm up between store and container?
Reefer transport
- Which container types and controllers are suitable for in-transit cold treatment, and who installs and calibrates the probes before departure?
- What route and transit time are planned? (Not stated in the circular — confirm with the shipping line.)
- What happens if the container cannot hold 1.1 °C pulp for 15 consecutive days? (Treatment-failure handling is not in the circular.)
Temperature monitoring
- What probe, calibration and data rules does the PIR set, and how will the proposed system meet them?
- Who downloads the treatment data, in what format, and who keeps the records for inspection?
- What alarms and escalation steps are in place during the voyage?
Destination and compliance checks
- PIR first: obtain and read the Phytosanitary Import Requirement attached to the APEDA circular before specifying rooms, reefers or loggers.
- Registration: whether orchards or packhouses must be registered is not stated in the circular — confirm with APEDA and India's plant protection organisation.
- Documents and labelling: phytosanitary certificate content, packaging and labels are not in the circular — confirm in the PIR and with your Vietnamese importer.
- Destination infrastructure: port and cold-storage arrangements in Vietnam are not described — confirm with your importer and the port operator.
- Re-check status: check APEDA announcements and Vietnam's Plant Protection Department before each season.
What remains open before you invest
- The full PIR content: systems-approach measures, registration, probes, documents and packaging
- Treatment-failure and non-compliance handling
- Transit times, destination port arrangements and cold storage in Vietnam
- Product storage temperature and humidity outside treatment
- Shipment activity on the lane (no data in the sources)
Where ColdMatch fits
ColdMatch is the industrial refrigeration and cold-chain procurement platform of Global B2B Group. For projects from USD 250,000 — for example packhouse pre-cooling, cold storage, loading docks or monitoring systems — the ColdMatch team reviews your brief, contacts suitable refrigeration technology and equipment suppliers on your behalf and presents organised, comparable responses. It is free for buyers, buyers and suppliers do not contact each other directly through the platform, and there is no obligation to award. If you want to buy the grapes themselves, use Global B2B Group.
Related guides and tools
- Export lane readiness checklist: Indian grapes to Vietnam
- 2026 cold-chain trade corridor opportunities
- Packhouse cold-chain refrigeration in India
- Produce pre-cooling methods
- Cold-chain temperature monitoring
- Perishable export cold-chain readiness
- Refrigeration load calculator and cold room size calculator
Request a quote for your cold-chain project
Ready to brief pre-cooling, cold storage or monitoring for this lane? Use the lane RFQ panel to carry commodity, route, season and temperature details into the form, or go straight to the RFQ builder. Final technical, phytosanitary and legal decisions stay with you, your engineers and the competent authorities.
Sources
Run the numbers
Calculators for this project type
Indicative planning figures only — final sizing belongs to the supplier's or consultant's detailed design.
Fish & seafood cold storage calculator
Chilled and frozen volume, ice demand and storage capacity for landing sites and processing plants.
Energy & backup powerEnergy & backup power cost calculator
Annual energy spend from load and running hours, plus the cost of generator hours during outages.
Frequently asked questions
Plan the numbers before you send an RFQ
The reference pages buyers use most before requesting quotes.

