Not sure which tool fits? Open smart search — every question mapped to the right calculator

Construtor de Especificação Técnica
Gere em minutos uma especificação técnica formal, pronta para RFQ, para o seu projeto de cadeia de frio. Compradores anexam este documento a qualquer licitação para que as propostas dos fornecedores sejam diretamente comparáveis — sem lacunas de escopo ocultas, sem comparação de preços desigual. Independente e neutro em relação a fornecedores.
Projeto
Salas
Requisitos do sistema
Normas e códigos
1. Project information
- **Project name:** New Cold Chain Facility - **Buyer / owner:** TBD - **Country / site:** Nigeria - **Industry:** seafood - **Total refrigerated volume:** 5,400 m³ across 3 room(s) - **Total pallet positions:** 3,120 - **Automation target:** TBD
2. Codes, standards & compliance
All equipment and workmanship shall comply with the latest editions of the following, in order of precedence: - ISO 9001 - HACCP - BRCGS Storage & Distribution - EN 378 - ASHRAE Handbook — Refrigeration (latest edition) as engineering reference - EN 378 / IIAR-2 for refrigerant safety (as applicable to chosen refrigerant) - Local Nigeria electrical, fire and food-safety codes shall govern where more stringent.
3. Site design conditions
- **Ambient design (summer):** 38 °C dry-bulb - **Relative humidity design:** 65% - **Peak sizing basis:** 1% ASHRAE design day for Nigeria - **Elevation / seismic / wind loads:** per local code — supplier to confirm at FAT
4. Room / temperature schedule
| Room | Temperature class | Volume (m³) | Pallets | Product | | --- | --- | ---: | ---: | --- | | Chilled hold | 0 °C to +4 °C (chilled) | 2000 | 1200 | Fresh produce | | Frozen hold | −18 °C to −22 °C (frozen) | 3000 | 1800 | Frozen finished goods | | Blast / IQF cell | −25 °C to −30 °C (deep-frozen / IQF hold) | 400 | 120 | Blast freezing |
5. Refrigeration system requirements
- **Refrigerant:** Open — supplier to propose with GWP, safety and TCO justification - **Redundancy:** N+1 at plant level (compressors, condensers, pumps, controls) - **Pull-down:** rooms shall reach set-point from ambient within 24 h at design ambient with product load = 0. - **Set-point stability:** ±1.0 K in chilled rooms, ±2.0 K in frozen rooms, ±0.5 K in pharma rooms. - **Efficiency:** part-load COP shall be reported at 25 / 50 / 75 / 100% at ARI-540 / EN 12900 conditions. - **Noise:** ≤ 75 dB(A) at 1 m from any compressor package; ≤ 55 dB(A) at property line. - **Refrigerant leak detection:** dual-technology sensors interlocked with plant trip and remote alarm. - Supplier to submit heat-load calculation, P&ID, pipe sizing, and equipment schedule with quote.
6. Envelope, insulation & doors
- Insulated panels: PU/PIR, density ≥ 40 kg/m³, class B fire rating minimum (EN 13501 / FM 4880 where applicable). - Panel U-values: chilled ≤ 0.30 W/m²K; frozen ≤ 0.20 W/m²K; deep-frozen ≤ 0.16 W/m²K. - Vapor barriers continuous; floor heating cable grids under frozen rooms with monitoring. - Cold-store doors: motorized bi-parting or hi-speed roll-up, heated frames, safety edge, opening cycle rating ≥ 200,000. - Dock equipment: insulated levellers, inflatable shelters, air-curtains at every reefer bay.
7. Controls, BMS & monitoring
- Refrigeration controls: open-protocol (Modbus TCP / BACnet IP) — no proprietary lock-in. - BMS shall log temperature at ≤ 5-min intervals for a minimum of 24 months with tamper-proof audit trail. - Remote alarm to on-call engineer via SMS + email; escalation matrix documented. - Trending, KPI dashboard and export to CSV / API for buyer's ERP / WMS.
8. Electrical, power & backup
- **Primary supply:** Utility grid with diesel/gas backup genset (N+1) - Backup power shall carry 100% of refrigeration load, 100% of controls, 50% of lighting, and dock equipment. - Auto-transfer time ≤ 10 s; fuel or battery autonomy ≥ 12 h at full load. - Power quality: THDi ≤ 5%; power factor ≥ 0.95 at PCC. - All motors ≥ IE3 (IEC 60034-30-1); VFDs on all compressors and evaporator fans.
9. Testing, commissioning & handover
- **FAT (Factory Acceptance Test):** buyer or nominated inspector to witness; pass/fail criteria pre-agreed. - **SAT (Site Acceptance Test):** performance run over ≥ 72 h at design load; deviations logged and re-tested. - **Pull-down test:** empty and loaded pull-down curves recorded. - **Temperature mapping (empty + loaded):** minimum 12 data-loggers per room, 48 h each phase. - Independent commissioning agent recommended and priced as an option in the bid.
10. Documentation deliverables
Supplier shall deliver, prior to final payment, hard copy + editable soft copy of: - Heat-load calculation, refrigerant charge calculation, pipe-sizing report - P&ID, single-line electrical, control philosophy, cause-and-effect matrix - As-built drawings (architectural, structural, MEP, refrigeration) - Equipment datasheets, serial numbers, refrigerant certificates - O&M manuals in Nigeria local language + English - Training records (minimum 3 buyer staff, 3 days on-site) - Spare parts list with 24-month critical spares priced separately
11. Warranty, spares & lifecycle
- **Warranty period:** 2 year(s) from SAT sign-off, parts and labour, response ≤ 24 h. - **Critical spares stocked:** 2 year(s) of consumables and wear items priced at bid stage. - **Service level agreement (SLA):** MTBF, MTTR and uptime targets shall be quoted for optional 5-year extended service. - **End-of-life:** supplier shall quote refrigerant recovery and equipment take-back option (F-Gas / Kigali compliant).
12. Bid evaluation criteria
Bids shall be evaluated on the following weighted matrix — buyer will not award on lowest capex alone: | Criterion | Weight | | --- | ---: | | Technical compliance (heat load, redundancy, safety) | 30% | | Lifecycle cost (10-year TCO — capex + energy + service) | 25% | | Delivery schedule + local execution capability | 15% | | Warranty, SLA and spares programme | 10% | | References — 3 similar projects in the last 5 years | 10% | | Financing / payment terms flexibility | 10% | Non-conformances must be listed on a dedicated deviation sheet with technical and commercial impact.
Construtor de especificação técnica: perguntas de compradores
- O que é uma especificação técnica pronta para RFQ?
- Um documento que lista, sala a sala, as classes de temperatura, a redundância da refrigeração, normas e códigos, controles, backup elétrico e testes de comissionamento com detalhe suficiente para que todos os fornecedores cotem o mesmo escopo — permitindo comparar propostas de forma justa.
- A ColdMatch projeta o sistema para mim?
- Não. Esta ferramenta cria um modelo estruturado inicial com base em boas práticas de engenharia independentes. Um engenheiro de refrigeração qualificado deve confirmar as condições finais de projeto, os cálculos de carga térmica e os requisitos de segurança antes de enviar a especificação aos fornecedores.
- Posso anexar isso diretamente a uma RFQ?
- Sim. Use "Anexar à RFQ" para levar os detalhes do seu projeto, salas e normas diretamente para o Construtor de RFQ, onde o mesmo escopo é enviado a vários fornecedores adequados.
- O resultado é neutro em relação a fornecedores?
- Sim. A especificação é independente de qualquer fabricante ou marca de refrigerante específica — ela lista a família de refrigerante, a redundância e as normas necessárias, deixando a seleção de equipamentos em aberto para as propostas dos fornecedores.
Indicative planning figures only — final sizing belongs to the supplier's detailed design. Request comparable supplier quotes · all cold chain tools · common cold chain questions
Send these inputs to an RFQ
Your size, cost and load inputs are copied into the quote form, so you don't type them twice. Nothing is sent until you review and submit.
Free for buyers, no obligation. These figures are estimates, not quotes — our team reviews your request and contacts suitable suppliers on your behalf.
Envie seu projeto para análise de especialistas
Envie seus requisitos. Um especialista da ColdMatch analisa cada pedido, prepara um resumo e apresenta fornecedores adequados — gratuito para compradores.