Offline — reconnect before saving or submitting. Changes on this page have not been sent.

Warehouse Refrigeration Tender

Warehouse Refrigeration Tender

Warehouse refrigeration enquiries should describe how the site operates as well as what equipment is required. ColdMatch organizes the buyer's brief for supplier responses; engineering calculations and building-interface decisions remain with appointed specialists.

Updated · ColdMatch Group procurement team

Human Global Expert Guidance•Vendor-Neutral Procurement•Team-Led Supplier Outreach•Commercial Confidentiality
Talk to a cold-chain expert on WhatsApp

Warehouse operating inputs

Document inventory, peak intake, door traffic and operating hours. Keep inventory capacity separate from product throughput and request clarification where information is unavailable.

  • Inventory, pallet positions and capacity units
  • Intake, product temperatures and operating schedule
  • Door, dock, floor and racking interfaces
  • Local works, commissioning and acceptance

Building and handling interfaces

Ask the relevant designers and contractors to check floor, racking, dock and handling-system interfaces. The RFQ form does not automatically validate structural loads, floor heating, robotic handling or refrigeration design.

Sizing inputs, costs and delivery milestones

Use inventory capacity, daily intake, entry and storage temperatures, site dimensions, power and operating hours as distinct inputs. Appointed engineers and suppliers must confirm duty and layout; a calculator is not a final design. Published cost bands are indicative planning assumptions, not a quotation. Obtain separate supplier-confirmed dates for design approval, manufacture, shipping, site readiness, installation and acceptance; no universal lead time is guaranteed.

  • Separate equipment supply from installed and EPC scope
  • Record quotation currency, validity, freight, duties and tax exclusions
  • Require stated performance conditions, warranty and local service obligations

Three-step managed RFQ process

Project-first procurement with human review.

  1. 1
    Define your project
    Record product, country, capacity, temperatures, scope, budget and timeline. Mark unknown inputs for clarification.
  2. 2
    Submit to ColdMatch
    Send the RFQ to our team for human review and organization. This is not a public tender award or a direct supplier broadcast.
  3. 3
    Review organized responses
    Our team contacts suitable suppliers on your behalf and presents organized responses. Confirm assumptions, exclusions and responsibilities before contracting.

Frequently asked questions

How ColdMatch Group works — independent B2B procurement and sourcing platform — ColdMatch Group is an independent B2B procurement and sourcing platform for industrial refrigeration, cold storage and cold-chain projects from USD $250K+, where the ColdMatch team reviews each buyer brief, contacts suitable third-party suppliers on the buyer's behalf and organizes their responses.