Cold Chain Procurement, from scoping to award
Cold chain procurement spans refrigerated warehousing, transport, last-mile handling and monitoring — and the tender documents behind each stage share more than most buyers realise. ColdMatch consolidates those tenders under one wizard and one supplier network, so procurement teams stop rebuilding the same schema every quarter.
One platform, every stage
Storage, blast freezing, distribution centres, refrigerated transport hubs, pharma cold chain, agricultural pre-cooling and processing plants all use the same underlying schema with stage-specific extensions.
Governance and audit trail
Every draft carries a version history. Every generated document carries a revision line. Every share carries a signed link with expiry. Regulated buyers can point auditors at the trail without reconstructing anything.
Vendor-neutral supplier network
The supplier network includes qualified international manufacturers, EPC contractors and specialist service providers. ColdMatch does not sell supplier placement — matching is based on capability, references and compliance evidence, not payment.
How to run a cold chain procurement cycle
Wizard-driven workflow adapted to your stage of the chain.
- 1Define the project envelopeEnter project country, industry, facility type (new build, expansion, retrofit), storage temperature bands, ambient conditions, capacity in m³ or tons, and daily throughput.
- 2Specify the refrigeration systemSelect system type (ammonia, CO₂ transcritical, cascade, HFC/HFO), refrigerant preference, and target components: compressors, evaporators, condensers, and control system.
- 3Describe the building envelopeAdd insulated panels, doors, flooring, loading docks, racking systems, and required standards (HACCP, BRC, GDP, ATEX, IFS) with regional certifications.
- 4Attach drawings and BOQUpload architectural drawings, single-line diagrams, tender BOQ, and any existing technical specifications. The AI assistant flags gaps in real time.
- 5Set commercial termsChoose Incoterms, payment terms, warranty period, delivery deadline, installation and commissioning scope, training, spare parts and maintenance SLA.
- 6Generate and distributeExport the RFQ, RFP, tender document, SOW, BOQ, evaluation matrix and executive summary as PDF, DOCX or XLSX. Share a secure link with qualified suppliers worldwide.