Offline — reconnect before saving or submitting. Changes on this page have not been sent.

← Retour au Centre de Connaissances
Industry guide

Guide de Transition des Fluides Frigorigènes — F-Gas, Kigali & NH₃/CO₂/HFO

Choix du fluide en neuf et rétrofit : règlement F-Gas, amendement de Kigali, fluides naturels (NH₃, CO₂, R290) vs mélanges HFO — TCO et sécurité.

From reading to a project decision

Who this helps
Owners, developers and procurement teams considering Refrigerant Transition Guide — F-Gas, Kigali & NH₃/CO₂/HFO Decisions.
Decision supported
Define product duty, site constraints and comparable scope before selecting equipment or requesting proposals.
Review status
A dated technical review is not recorded for every legacy guide. Confirm current product specifications and local requirements with the responsible specialists; no fresh review is implied.
Free access
Read, calculate and use checklists without an account, payment or lead submission. Requesting procurement support is optional.
Sizing, temperature and energy checklist
  • Record product, packaging, incoming/target temperatures, humidity and permitted excursions from your product specification.
  • Record peak stock, daily intake, dwell time, loading schedule and seasonal peaks from your own operating records.
  • Confirm grid connection, usable site area, ambient conditions, water and transport interfaces.
  • Use declared operating hours, load, tariff and system efficiency; preserve assumptions when comparing scenarios.
  • Have the refrigeration engineer and responsible food/pharma quality lead verify the scope before equipment selection.
Destination, season & logistics checklist

A project evidence checklist, not a seasonal forecast. Complete it for each destination using dated operating records, product specifications and responsible local specialists.

Destination & handoffs
Record origin, destination, transport mode, loading/unloading points, planned transit and expected waiting time. Identify who monitors temperature and handles excursions at each handoff.
Season & peak capacity
Record actual peak months, daily intake, dispatch, dwell time and highest stock from dated records. Label forecasts separately; do not turn an annual national trade indicator into a monthly demand estimate.
Temperature & energy duty
Use the product's approved temperature range, incoming temperature, packaging and loading schedule. Record site ambient assumptions, door-opening frequency, power availability and tariff period for capacity and energy comparisons.
Site & unresolved risks
Confirm grid, water where required, vehicle access and dock interfaces. Record the evidence owner, source date and unresolved constraint; leave unknown inputs blank rather than presenting them as verified.

Related source material: FAO post-harvest handling manual for food handling context; existing distribution planning guide and site due diligence checklist. This checklist does not establish a food/pharma specification, legal approval or engineered capacity.

Reference library, not verification of every legacy claim: FAO post-harvest management · WHO pharmaceutical temperature mapping, May 2015 · Official regulatory sources. Calculators are preliminary scenarios, not engineering certification or guaranteed results.

Regulatory clock

EU F-gas (2024 revision) bans most HFCs >150 GWP in new commercial refrigeration by 2030; service bans on R404A already effective. Kigali locks in an 85% HFC phase-down for developed countries by 2036, 80% for A5 group 1 by 2045. Anyone buying R404A/R507 today is buying stranded capex.

Natural refrigerant decision matrix

Load >300 kW & industrial site: NH₃ low-charge (best OPEX, needs safety zoning and trained staff). Load 100–300 kW: NH₃/CO₂ cascade or CO₂ transcritical. Retail / small commercial: propane (R290) packaged or CO₂ transcritical. Occupied spaces where NH₃ prohibited: CO₂ transcritical + subcritical boosters, or HFO blend as bridge.

HFO blends — bridge only

R448A, R449A, R452A cut GWP ~65% vs R404A but still face phase-down and are 3–5× the price of naturals long-term. Use only for near-term retrofits where full plant replacement is 5+ years out.

Safety & permitting

NH₃: EN 378 / ANSI IIAR classification, machinery room ventilation, gas detection, competent-operator training. CO₂ transcritical: pressure certification (>90 bar), pressure relief design, dew-point management. R290: charge limits (150 g in most jurisdictions, higher with EN 60335-2-89 amendments), ATEX for machinery room.

TCO horizon

Over 15-year plant life, NH₃ low-charge or NH₃/CO₂ cascade is 20–35% cheaper than HFO blend for industrial loads. CO₂ transcritical wins in temperate climates and pushes ahead further as electricity prices rise. HFO always loses on refrigerant quota cost by year 8.

Questions fréquentes

Can I still buy R404A equipment in 2026?

In the EU, no for new systems. In non-EU markets, yes but the F-gas ripple + Kigali quota means refrigerant price will spike 4–8× by 2030. Not a sound capex decision.

Is CO₂ transcritical really viable above 40°C ambient?

Yes with parallel compression and ejectors, but efficiency gap vs NH₃/CO₂ cascade widens. Above ~40°C design ambient (Gulf, Sahel, tropical), cascade wins. Below 32°C ambient, transcritical is the default for new frozen DCs.

RFQ from this guide

Obtenez des devis fournisseurs gratuits

Envoyez un RFQ et recevez des devis présélectionnés d'EPC frigorifiques vérifiés.

Obtenez des devis fournisseurs gratuits

Opens the RFQ builder with fields prefilled from this guide — editable before submission.

Recevoir les lectures ColdMatch

Lectures sur le froid industriel et la chaîne du froid pour les acheteurs qui préparent un projet.

Vous recevrez une synthèse des nouveaux articles, guides du Centre de connaissances et fiches technologiques pour les thèmes choisis : titres, courts résumés et liens. Aucune offre commerciale ni promotion de fournisseurs.

Thèmes
Fréquence

Distinct des demandes de projet. Chaque e-mail contient des liens de désabonnement et de préférences. Avis de confidentialité