Quick answer
Start by confirming the current heat load and whether it has changed. Then compare a retrofit and a replacement on the same basis: capacity at stated design conditions, energy use, refrigerant compliance and availability, maintenance and failure history, safety requirements and lifecycle cost over the same period. Choose from quotations and engineering assessment, not from equipment age alone.
Temperatures and conditions depend on the product and local law. Confirm with your food-safety authority and product specification.
Has your heat load changed?
A system that worked well ten years ago may now face more product, warmer intake, more door cycles or higher ambient temperatures. Before comparing equipment, reconcile today's load drivers with the original design: product type and tonnage, intake temperature, room volumes, door activity and design ambient. If original design data is missing, ask an engineer to estimate the load and state assumptions.
Comparison table
| Criterion | Evidence from your records | Ask bidders for |
|---|---|---|
| Capacity | Pull-down curves, run hours, excursions at peak | Capacity at stated design conditions |
| Energy | kWh per tonne trend, peak demand | Expected energy at your operating profile, with method |
| Refrigerant | Type, charge, leak and top-up history | Compliance with local rules and future availability |
| Maintenance | Breakdowns, parts lead times, cost per year | Service plan, spares, local response |
| Safety | Machine room condition, detection, inspections | Compliance with applicable safety standards and codes |
| Disruption | Demand windows | Installation plan and downtime |
| Lifecycle cost | Your energy tariff, labour, losses | Capex, maintenance and expected life on the same horizon |
Why refrigerant rules matter
Many countries are reducing high-GWP refrigerants under the Kigali Amendment to the Montreal Protocol; in the EU, Regulation 2024/573 sets service and placing-on-market restrictions. A retrofit that keeps a restricted refrigerant may face rising service costs or availability limits. Check the rules that apply at your site; they differ by country and equipment type.
Lifecycle comparison you can run
Lifecycle cost (per option) = capex + Σ over N years (annual energy cost + maintenance + expected repair + refrigerant service) − residual value. Use the same N, the same tariff and the same operating profile for both options. Do not add avoided-loss benefits unless you can trace them to your spoilage records.
Hypothetical, method only: option A (retrofit) capex 100, annual running 40; option B (replace) capex 220, annual running 28; over 10 years A = 500 and B = 500. Equal totals mean the decision turns on risk, refrigerant compliance and disruption — not on the arithmetic.
What if you lack energy or maintenance data?
Install temporary metering on the refrigeration supply for several weeks and rebuild a maintenance log from invoices. Mark all derived figures as estimates and ask bidders to use the same values.
Checklist
- Current heat load reconciled with original design
- Refrigerant type, charge and leak history documented
- Breakdown and parts history summarised
- Safety inspection status known
- Both options quoted on the same basis
- Lifecycle comparison on the same horizon and tariff
Storage conditions depend on product, site and local law. No option should be presented as guaranteeing savings.
Frequently asked questions
Is an old system always better replaced?
No. Age is a prompt to assess, not a decision. Condition, load fit, refrigerant status and parts availability matter more.
Can I switch refrigerant in my existing system?
Sometimes, but compatibility, capacity, safety class and local rules must be confirmed by a qualified engineer.
How many years should the lifecycle comparison cover?
Use a horizon that reflects your business plan and expected equipment life, and apply it to both options.
Should savings estimates come from suppliers?
Ask for them with the method and assumptions, and verify after installation with metered data.
Tools and next steps
Sources and standards
- UNEP Ozone Secretariat — Montreal Protocol and Kigali Amendment
- Regulation (EU) 2024/573 on fluorinated greenhouse gases
- ISO 5149-1 — Refrigerating systems and heat pumps: safety and environmental requirements
- International Institute of Refrigeration (IIR) — technical resources
- FAO & UNEP (2022). Sustainable Food Cold Chains: Opportunities, Challenges and the Way Forward