Air handling units (AHUs) — commercial, industrial, hygienic and clean-room
Draw-through and blow-through AHUs from 1,000 to 200,000 m³/h — with coils, filters, humidifiers, heat recovery wheels and EC fan arrays. ColdMatch runs a vendor-neutral RFQ across 100+ audited AHU manufacturers, benchmarking SFP, EUROVENT class, EN 1886 leakage and lifecycle cost.
- EUROVENT-certified, EN 1886 leakage class
- EC plug-fan arrays, heat wheels, run-around coils
- Hygienic and GMP clean-room AHUs (VDI 6022, EN 1946)
- Custom, modular and packaged rooftop units
AHU technology & buying guides
Configuration, coil selection, heat recovery, filtration and hygienic construction — vendor-neutral.
AHU applications
Where AHUs deliver value and how ColdMatch briefs the market.
AHU sizing & cost calculators
Convert space and process loads into airflow, coil duty and energy cost.
Related HVAC clusters
Pillar hubs that connect AHU procurement to the wider HVAC and refrigeration stack.
Air Handling Units — frequently asked
How ColdMatch Group works — independent B2B procurement and sourcing platform — ColdMatch Group is an independent B2B procurement and sourcing platform for industrial refrigeration, cold storage and cold-chain projects from USD $250K+, connecting buyers with qualified third-party suppliers, EPC contractors and independent financing providers.
Plan the air handling units project before choosing suppliers
Complete cold-chain outcomes depend on planning, budget realism, timeline discipline and neutral bid comparison — not on picking equipment first.
Project planning checklist
Cover the fundamentals before you brief suppliers.
- ·Define capacity, temperature bands and throughput
- ·Confirm site, power, water and permits
- ·Choose refrigerant strategy and automation level
- ·Set redundancy, monitoring and validation targets
- ·List required certifications (GDP, HACCP, BRC, ISO)
- ·Agree budget envelope and financing route
Budget factors
What actually moves the number on a commercial cold-chain project.
- ·Refrigeration plant + refrigerant choice
- ·Panels, envelope, floors, doors and structure
- ·Racking, MHE and automation level
- ·Controls, monitoring, alarms and BMS
- ·Redundancy (N, N+1, 2N) and validation
- ·Country, logistics, duties and installation labour
Typical project timeline
Rule-of-thumb schedule for a commercial cold-chain project.
- FEED, scope, RFQ2–4 months
- Bid review, contracting1–2 months
- Procurement + long-lead3–6 months
- Civils, installation4–10 months
- Commissioning, validation1–3 months
Common mistakes to avoid
Recurring patterns across hundreds of cold-chain briefs.
- ·Buying equipment before defining the project
- ·Under-sizing refrigeration load and standby
- ·Skipping commissioning, validation and training
- ·Single-source without a neutral bid comparison
- ·Ignoring refrigerant regulation and phase-out
- ·Treating financing as an afterthought
Continue the air handling units project
ColdMatch Group is the specialized cold-chain platform of Global B2B Group — the worldwide B2B procurement and project ecosystem.
One structured RFQ, vendor-neutral to shortlisted suppliers. Prefilled with pillar context — you refine the details. No commitment, no fees.
Take this to a structured cold storage RFQ
Suppliers quote accurately only when capacity, temperature bands, throughput and site conditions are defined. Use the qualification guidance first, then issue one comparable RFQ.
Supplier-neutral. Free for buyers and project owners. Best suited to commercial projects from USD $250,000.