Calculation method
- 1. Readiness score = Σ weights of completed GDP checks
- 2. Room volume (m³) = pallets × 4.2
- 3. Duty (kW) = volume × 24 W/m³ ÷ 1000
- 4. Generator kVA = ⌈duty × 2.6 start/auxiliary factor ÷ 0.8 × 1.15⌉
Calculations run in SI (m, m², m³, kW, kg, °C). Imperial equivalents: 1 m² = 10.76 ft², 1 m³ = 35.31 ft³, 1 kW = 3,412 BTU/h = 0.284 TR, 1 t = 2,205 lb, °F = °C × 1.8 + 32.