Seafood and shellfish cold storage temperature requirements
Seafood facilities usually combine several temperature classes on one site — chilled receiving, IQF or blast freezing, frozen storage and a dispatch buffer. The procurement challenge is dimensioning each stage so that the freezing duty, not the storage volume, sets the plant size.
| Condition | Indicative temperature | Humidity | Engineering note |
|---|---|---|---|
| Live / chilled holding | 0 to +4 °C | 90–95 % RH | Live shellfish handling has species-specific requirements. |
| Chilled processing | +2 to +6 °C | 85–90 % RH | High internal gains from equipment and personnel. |
| IQF freezing | −35 to −40 °C air | n/a | Individually quick frozen shrimp and small species. |
| Frozen storage | −18 to −25 °C | 90–95 % RH | Export contracts frequently specify the colder end. |
Values are indicative planning ranges used for early-stage refrigeration sizing and procurement. They do not replace product-specific food-safety, pharmaceutical, regulatory or customer requirements, which take precedence in every case. Confirm final conditions with your quality function and a qualified refrigeration engineer.
Refrigeration engineering considerations
IQF vs. blast batch
IQF tunnels and spiral freezers are continuous-flow machines sized on kg/hour; batch blast rooms are sized on tonnes per cycle. The choice changes the plant, the layout and the CAPEX profile.
Glazing and dehydration
Where glazing is used, the associated water handling, drainage and refrigeration load must be included in the design brief.
Hygienic design
Washdown-rated panels, floors, drainage and coil materials affect both capital cost and refrigeration selection.
Peak season load
Seasonal landings mean the plant must handle a peak that may be several times the annual average. Design to the peak, control to the average.
From temperature to system requirement
- 1. Confirm the storage condition for your product and market.
- 2. Size the room — cold room size calculator.
- 3. Calculate the refrigeration duty — refrigeration load calculator.
- 4. Check operating cost — electricity cost calculator.
- 5. Send one brief to vetted suppliers — build an RFQ.
A senior cold-chain specialist stays with your project from first brief to commissioning.
Related
Frequently asked
One brief, comparable quotes from vetted cold storage suppliers and EPCs.