Offline — reconnect before saving or submitting. Changes on this page have not been sent.

Public-funded agricultural refrigeration · buyer planning

Development-funded cold chain: verified project evidence

Development funding is not a refrigeration purchase order. Gabiro Phase II has an AfDB general procurement notice dated 24 September 2026; IFAD’s Bouna announcement describes cold-chain infrastructure within a US$344.5 million agro-industrial project. Neither source establishes an available refrigeration package budget or a live bidding deadline. Use these documents as planning evidence, then confirm the implementing agency’s current package status.

Editorial review / source check: 15 October 2026 · ColdMatch Group. Planning education, not signed engineering or legal advice.

Read the procurement stage before treating it as demand

  1. 1Programme / approved financing
  2. 2GPN / procurement plan
  3. 3Package notice / agency clarification
  4. 4Buyer technical brief
  5. 5ColdMatch human review

How to validate funded demand without inventing a package

Read the official project document, then the current procurement plan and any package-specific amendments. Record the document date separately from the date you accessed it. An overall investment envelope can include irrigation, roads, training and financial services as well as refrigeration.

  • Match project ID, implementing agency and package reference across documents.
  • Check whether the package is goods, works, design services or operations.
  • Mark planned, cancelled, closed, awarded and unknown separately.
  • Request scope confirmation from the buyer; no automated harvesting or outreach is performed by this site.

Implementation and consultant interfaces

A design consultant may control the load basis while the PIU controls procurement and a prime contractor controls installation interfaces. Request an interface matrix naming responsibility for civil works, electrical connection, refrigeration, controls, training and acceptance. Do not imply a consultant appointment or EPC award from a funding announcement.

Verified evidence — not an open-tender list

These are dated source records, not live alerts. A GPN, scheme page or project launch does not confirm an open bid. No awarded refrigeration contractor or current package deadline has been verified here. Ask the agency for the latest procurement plan, amendments, package reference and status; do not infer a cooling budget from a programme total.

Official record / source dateWhat is evidencedFunding versus cooling packageStatus boundary
Rwanda · Gabiro Phase II · 24 Sep 2026 [1]GPN title explicitly includes cold-chain logistics and cold storage; Japan-administered PHRDG financing through AfDB.No refrigeration package value established in the reviewed landing notice.General notice only; no live equipment invitation asserted.
Côte d’Ivoire · Bouna · 21 Apr 2026 [2]IFAD launch describes processing, storage, cold chain and logistics at a 25-hectare Aggregation and Services Centre.US$344.5m is the entire agro-industrial project, not refrigeration procurement.Launch evidence; package scope, award and current deadline unverified.
India · Kerala KERA P178254 · 13 Apr 2026 [3]World Bank document catalog verifies a procurement plan for the agricultural value-chain modernization project.Cold-chain line items and package budgets not verified from the catalog.Plan reference only; inspect the underlying plan before inferring equipment demand.
India · MoFPI scheme [4]Guidance includes pre-cooling, multi-temperature storage, packing, distribution hubs and fisheries-related cooling.Scheme eligibility is conditional; no grant amount or open application window asserted.Scheme guidance; published implementation-list reference dated 30 Jun 2026.

Costing and risk register to take into the project review

  • Scope each line as included / excluded / unknown, with owner and revision date.
  • Survey land/title, civil works, drainage, floor and envelope condition.
  • Price power connection, transformer, standby generation and fuel arrangements.
  • Separate product pull-down from holding and future growth.
  • Request freight, duties/taxes and Incoterm boundaries without assuming exemptions.
  • Price mapping, calibration, training, spares, maintenance and refrigerant end-of-life.
  • Confirm refrigeration package value independently of the programme envelope.
  • Record operator, permitted use and residual asset liabilities for build vs buy.
Costing and risk register to take into the project review

Prepare a project RFQ

For refrigeration projects from USD 250,000: describe your project, add scope and contact details in the existing project request. ColdMatch validates it, contacts suitable suppliers on your behalf and presents organized responses for human review. No supplier broadcast, automatic contact or public tender submission. Free tools remain available for smaller projects.

Prepare a project RFQ

ColdMatch Group is the industrial refrigeration and cold-chain procurement platform of Global B2B Group, where commercial and industrial buyers build a project and submit an RFQ; the ColdMatch team validates and organizes it, contacts suitable refrigeration technology and equipment suppliers on the buyer's behalf, and presents organized responses through ColdMatch. Independent and supplier-neutral: not a contractor, government-approved supplier, tender adviser or bidding agent. No grant, award or financing guarantee. Global B2B Group covers multi-vertical project orchestration; ColdMatch covers refrigeration requirements.

Specific buyer questions

Does a GPN mean a refrigeration tender is open?

No. It is general planning evidence. Verify the agency’s current package notice, amendments and deadlines; none is asserted open here.

Is the US$344.5m Bouna announcement a cold-store budget?

No. IFAD describes the whole agro-industrial project. A refrigeration package value is not established by that announcement.

Official sources and methodology references

  1. AfDB · Gabiro Phase II · General Procurement Notice · 24 Sep 2026
  2. IFAD · Côte d’Ivoire / Bouna · project launch · 21 Apr 2026
  3. World Bank · KERA P178254 · procurement plan · 13 Apr 2026
  4. MoFPI · Integrated Cold Chain and Value Addition Infrastructure · scheme guidance
  5. FAO / WHO · Codex CXC 1-1969 · General Principles of Food Hygiene
  6. FAO / UNEP · Sustainable Food Cold Chains · 2022