EPC Marketplace

Cold chain EPC marketplace — qualified engineering, procurement & construction partners

Match with qualified EPC (Engineering-Procurement-Construction), EPCM and design-build contractors for industrial refrigeration, cold storage, food processing, pharma cold chain, port cold hubs and mega distribution centers. ColdMatch pre-qualifies partners on tonnage experience, refrigerant certifications, safety record, in-country coverage and financial stability — then briefs 3–5 for comparable proposals on CAPEX, schedule, kWh / m³ · yr and 20-year lifecycle cost.

Human Global Expert GuidanceVendor-Neutral ProcurementQualified International SuppliersCommercial Confidentiality
  • EPC turnkey, design-build GMP, EPCM and BOOT / BOT models
  • Ammonia, CO2, HFC / HFO and hybrid refrigerant qualification
  • 40+ countries — regional depth in NA, EU, MENA, LATAM, APAC, Africa
  • 3–5 pre-qualified bidders per project — apples-to-apples proposals
Section 1

Delivery models (route to a pre-filled EPC RFQ)

Section 3

Sourcing, financing & tools

FAQ

EPC Marketplace — frequently asked

How ColdMatch Group works — independent B2B procurement and sourcing platform ColdMatch Group is an independent B2B procurement and sourcing platform for industrial refrigeration, cold storage and cold-chain projects from USD $250K+, connecting buyers with qualified third-party suppliers, EPC contractors and independent financing providers.

Project-first

Plan the epc marketplace project before choosing suppliers

Complete cold-chain outcomes depend on planning, budget realism, timeline discipline and neutral bid comparison — not on picking equipment first.

Project planning checklist

Cover the fundamentals before you brief suppliers.

  • ·Define capacity, temperature bands and throughput
  • ·Confirm site, power, water and permits
  • ·Choose refrigerant strategy and automation level
  • ·Set redundancy, monitoring and validation targets
  • ·List required certifications (GDP, HACCP, BRC, ISO)
  • ·Agree budget envelope and financing route

Budget factors

What actually moves the number on a commercial cold-chain project.

  • ·Refrigeration plant + refrigerant choice
  • ·Panels, envelope, floors, doors and structure
  • ·Racking, MHE and automation level
  • ·Controls, monitoring, alarms and BMS
  • ·Redundancy (N, N+1, 2N) and validation
  • ·Country, logistics, duties and installation labour

Typical project timeline

Rule-of-thumb schedule for a commercial cold-chain project.

  1. FEED, scope, RFQ2–4 months
  2. Bid review, contracting1–2 months
  3. Procurement + long-lead3–6 months
  4. Civils, installation4–10 months
  5. Commissioning, validation1–3 months

Common mistakes to avoid

Recurring patterns across hundreds of cold-chain briefs.

  • ·Buying equipment before defining the project
  • ·Under-sizing refrigeration load and standby
  • ·Skipping commissioning, validation and training
  • ·Single-source without a neutral bid comparison
  • ·Ignoring refrigerant regulation and phase-out
  • ·Treating financing as an afterthought
Brief the market on your epc marketplace project

One structured RFQ, vendor-neutral to shortlisted suppliers. Prefilled with pillar context — you refine the details. No commitment, no fees.

Compare Suppliers — Prefilled RFQ
EPC & turnkey procurement

Cold storage EPC — buyer questions answered

What does an industrial cold storage EPC project include?

Engineering (process, mechanical, electrical, civil interfaces), procurement of the refrigeration plant, insulated envelope, doors, controls and electrical equipment, then construction, installation, testing, commissioning, operator training and handover documentation. Land, permits, utility connections and external civils are frequently excluded — confirm the scope boundary line by line, because envelope-plus-plant scope and full EPC scope can differ substantially in price for the same building.

What is the difference between equipment supply and turnkey EPC?

Equipment supply delivers specified machinery to site, leaving design integration, installation, commissioning and performance risk with the buyer. Turnkey EPC places one contractor under a single contract for design, supply, installation, commissioning and a stated performance guarantee. Equipment-only procurement is usually cheaper on paper; turnkey removes interface risk and is often what lenders require.

What equipment is required for an industrial cold storage project?

Refrigeration plant (compressors, condensers or evaporative heat rejection, evaporators, pressure vessels, pipework, refrigerant), insulated panels and insulated floor, cold-store doors, airlocks and dock equipment, electrical distribution with variable-speed drives, standby power, controls with temperature monitoring and alarms, and — where relevant — racking, blast cells and ice generation.

How do I select a refrigeration supplier or EPC contractor?

Qualify on references at your capacity band and temperature level, refrigerant-specific competence and certification, in-country service presence and spare-parts lead time, financial stability, and safety record. Then issue one identical brief to three to five qualified bidders so the offers can be compared on capacity at design conditions, stated annual energy, schedule, warranty and total lifetime cost, not on headline price.

What information should a cold storage RFQ include?

Product and application, temperature setpoint and tolerance, capacity in m³ or pallet positions, clear height, daily throughput and product entry temperature, site ambient design conditions, power supply and backup arrangement, refrigerant preference or restriction, redundancy requirement, scope boundary, required documentation and testing, and target commissioning date.

How long does a typical industrial cold storage project take?

Planning ranges from brief to commissioning: two to six weeks to compare quotations, eight to sixteen weeks for manufacturing, four to seven weeks of shipping on import-dependent lanes, one to three weeks for clearance and haulage, then three to ten weeks of installation and commissioning. Small packaged rooms can complete far faster; large engineered plants and EPC contracts run longer.

Who handles installation and commissioning?

Under turnkey EPC, the contractor does, under a single performance obligation. Under equipment-only supply, the buyer appoints a mechanical installer and usually pays the OEM separately for supervision and commissioning. Either way the contract should name who witnesses factory and site acceptance testing, and who signs off performance at design conditions.

What affects the cost of a cold storage EPC project?

Installed refrigeration capacity and temperature level, refrigerant and system architecture, insulation specification, building type, site climate and grid quality, redundancy level, freight and import duty, local labour rates, and the scope boundary itself. Two quotations for the same building routinely differ by a quarter or more purely because their scope differs.

Planning an industrial cold-chain project? Send the project location, required capacity, product, operating temperature and target timeline so the requirement can be reviewed. ColdMatch Group is a B2B industrial cold-chain sourcing and project-matching platform — we help buyers define the requirement and identify relevant suppliers, manufacturers and EPC providers. We are not a refrigeration manufacturer, an EPC contractor, a cold-storage operator or a lender, and there is no automatic connection: every brief is reviewed by our team before introductions are made.

Qualify, then request quotes

Take this to a structured cold storage RFQ

Suppliers quote accurately only when capacity, temperature bands, throughput and site conditions are defined. Use the qualification guidance first, then issue one comparable RFQ.

Supplier-neutral. Free for buyers and project owners. Best suited to commercial projects from USD $250,000.