Project Cost Estimator

Cold storage capex — instant range

Order-of-magnitude budget for new cold storage and refrigerated facilities. Ranges reflect real ColdMatch projects.

Estimated capex range
$780K – $1.26M
Midpoint ≈ $1,020,000

Excludes land acquisition, racking, MHE, and grid upgrades beyond standard service. ColdMatch can break this down by line item once we receive your brief.

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

FAQ · Multilingual

Turnkey project cost estimate for cold storage builds: civil, insulation, refrigeration, MEP, controls, commissioning and contingency.

  • What's included in the turnkey budget?
    Civil works, panel insulation, refrigeration plant, MEP, controls & monitoring, commissioning, engineering fees and a 10–15% contingency line.
  • Is land included?
    No — land acquisition, permits and site prep are excluded and vary too widely by country to benchmark.
Direct answer

Total cold storage project cost breaks down roughly as: envelope and insulated panels 25–35%, refrigeration plant 25–35%, racking and material handling 10–20%, electrical and controls 8–12%, and installation, commissioning and contingency 10–15%. Indicative all-in cost is USD 900–1,400 per m³ chilled and USD 1,300–2,000 per m³ frozen, excluding land.

Frequently asked questions

What does a cold store cost per m³?

Roughly USD 900–1,400 per m³ for chilled and USD 1,300–2,000 per m³ for frozen, turnkey excluding land and grid upgrades.

What contingency should I hold?

10–15% of CAPEX. The most common overruns are power connection, ground works and currency movement on imported equipment.

Which cost lines vary most between countries?

Civil works and labour vary widely; imported refrigeration equipment prices are far more uniform, plus freight and duties.

Cold storage project cost: buyer questions

What does a cold storage project cost end to end?
Budget for civil works and floor, insulated envelope, refrigeration plant, doors and docks, racking and MHE, power infrastructure and backup, controls and monitoring, commissioning and compliance. Equipment is usually only 45–60% of total delivered cost.
Which line items are most often underestimated?
Power connection and backup generation, insulated floor slab and sub-floor heating, dock levellers and anterooms, freight and duties, installation labour and commissioning, plus local certification. Together these can add 25–40% to an equipment-only budget.
How does country affect the budget?
Design ambient, tariff, import duties, freight distance, local labour rates and certification regimes all move the total. The same chamber can differ by 30% or more between two countries, which is why country belongs in the RFQ from the start.
Does ColdMatch finance projects?
No. ColdMatch is not a lender and gives no financial advice. Where a project is large enough and otherwise suitable, it may be introduced to independent financing partners who assess it under their own criteria.

Indicative planning figures only — final sizing belongs to the supplier's detailed design. Request comparable supplier quotes · all cold chain tools