Offline — reconnect before saving or submitting. Changes on this page have not been sent.

Country refrigeration procurement brief · Colombia

Industrial refrigeration and cold storage procurement in Colombia

Colombia is a major exporter of flowers, bananas, and avocados, with a growing domestic retail sector and a strategic location for regional logistics hubs.

Direct procurement answer

Refrigeration in Colombia is regulated by the Ministry of Environment's Ozone Technical Unit (UTO) and ANLA for HFC management. Food and medicine storage is overseen by INVIMA (human) and ICA (agricultural/veterinary). Facilities must comply with the NSR-10 seismic code and RETIE electrical regulations.

For a cold storage project in Colombia, define throughput, temperature zones, clear height, refrigerant constraints and utility capacity before requesting prices. Use one technical brief for every bidder, verify local compliance evidence and compare lifecycle cost rather than equipment price alone.

Country-specific planning priorities

The Colombian cold chain market

Export agriculture and urban distribution drive investment.

  • Flower exports through Bogotá (BOG) and banana/avocado exports via sea ports.
  • Retail distribution centers serving major cities like Bogotá, Medellín, and Cali.
  • Meat and poultry processing for the growing domestic consumer market.

Regulations

Environmental, sanitary, and structural safety rules apply.

  • UTO manages the phase-out of ozone-depleting substances and HFC reduction.
  • INVIMA supervises good storage and distribution practices for food and drugs.
  • NSR-10 seismic design is mandatory for buildings and storage structures.

Cost and timeline drivers

Altitude, climate, and electrical certification shape budgets.

  • High altitude in Bogotá affects air density and equipment performance.
  • RETIE certification for electrical installations is a critical requirement.
  • Logistics challenges in mountainous regions can impact transport of heavy equipment.

A supplier-ready procurement sequence

  1. 01Confirm products, daily throughput, storage duration and temperature zones.
  2. 02Convert demand into room layout, pallet positions, cooling duty and utility requirements.
  3. 03Record local permitting, refrigerant, food or pharmaceutical obligations in the same brief.
  4. 04Issue an identical RFQ to qualified suppliers and compare exclusions, controls, commissioning and service coverage.
  5. 05Complete engineering and local compliance review before contract award.

Official sources for these rules

Rules on this page are summarised from the regulators and legal texts below. Always read the current version before design or tender.

Links checked: 2026-09-26

Preliminary project estimate

Model the layout, insulated envelope, cooling capacity and indicative budget for Colombia. The result transfers into a supplier-ready RFQ.

Preliminary cold store estimate

Enter floor area, clear height, temperature and panel material. The estimate combines layout, materials, a project brief and budget in one result.

1. Layout

Room footprint24.5 × 16.3 × 8 m
Racked storage300 m²
Loading / staging60 m²
Plant & aisles40 m²
Rack levels4
Pallet positions788
Insulated doors2

2. Building materials

Panel surface (walls + ceiling)1053 m²
Floor insulation400 m²
Volume3200 m³
Cooling capacity128 kW

3. Budget

Insulated panelsCOP 114,861,694
Floor insulation / heatingCOP 22,960,000
Refrigeration equipmentCOP 330,624,000
Insulated doorsCOP 25,830,000
Pallet rackingCOP 203,540,400
Installation labourCOP 111,371,423
Electrical & controlsCOP 56,557,883
Contingency (10%)COP 86,574,540
Indicative totalCOP 952,319,940

4. Project brief (copy for suppliers)

Colombia — Cold store, Chilled 0…+4 °C, 400 m² × 8 m clear height, PIR 100 mm panels, approx. 788 pallet positions, approx. 128 kW refrigeration. Indicative budget COP 952,319,940. Please quote on these assumptions.

Rough planning estimate using general assumptions (40/60 W per m³, 1.9 m² per pallet position, typical panel prices). Excludes land, building shell, permits, taxes and freight. Not a quotation.

COP · ×0.7 local cost level · DANE: Índice de Costos de la Construcción de Edificaciones (ICOCED)

Get this reviewed — start an RFQ

Questions buyers ask before tender

Who regulates refrigerants in Colombia?

The Ozone Technical Unit (UTO) of the Ministry of Environment and ANLA manage HFC and ODS regulations.

What is INVIMA's role in cold storage?

INVIMA supervises the storage and distribution of food, drugs, and medical devices to ensure safety and quality.

Does the Colombian seismic code affect racking?

Yes, the NSR-10 code requires seismic design for both the building and the high-bay racking systems.

Can ColdMatch help with a Colombia project?

Yes. ColdMatch reviews the brief, prepares a comparable RFQ and introduces independent suppliers. It does not build, sell or finance facilities.

How does ColdMatch select suppliers for this country?

ColdMatch first reviews project scope, location, scale and technical requirements. The team then contacts suitable suppliers on the buyer's behalf and presents organized responses; suppliers cannot buy a ranking or automatic shortlist position.

ColdMatch reviews the project brief, contacts suitable independent suppliers on the buyer's behalf and presents organized responses. It does not manufacture, install, guarantee, lend, provide financial advice or sell paid rankings.

Two procurement paths

Competitive quotations or one accountable EPC partner

For commercial and industrial projects from USD 250K+. ColdMatch reviews the project, contacts suitable independent manufacturers, integrators or EPC contractors on the buyer's behalf, and presents organized responses for comparison. Final execution responsibility remains with the selected contractor or supplier.

A. Multi-supplier procurement

One structured RFQ, comparable quotations from several technically relevant suppliers. Best when you manage the design or want to benchmark equipment packages.

Start a multi-supplier RFQ

B. Turnkey EPC matching

One accountable manufacturer, integrator or EPC contractor for the complete scope: thermal design, refrigeration plant, panels, racking, automation, controls, backup, shipping, installation, commissioning, training, warranty and maintenance — delivered by the contractor, not by ColdMatch.

Start a turnkey EPC brief

Turnkey, EPC and supply: direct answers

What is a turnkey cold storage project?
A project where one accountable manufacturer, integrator or EPC contractor delivers the complete facility — design, refrigeration plant, insulated envelope, installation and commissioning — under a single contract with single-point responsibility.
What does a refrigeration EPC contractor provide?
Engineering (thermal load and plant design), procurement of equipment and materials, and construction: installation, commissioning, training and handover, usually with warranty and optional maintenance.
What information is required before quoting a cold store?
Product stored, temperature zones, storage volume or pallet positions, daily throughput and entry temperature, site and ambient design temperature, power supply and backup, redundancy level, scope of supply, budget and project stage.
Can one contractor deliver the complete cold-chain project?
Yes, for many projects a single EPC contractor or integrator can take full responsibility. Very large or multi-site programmes sometimes split civil works, refrigeration and automation between specialists.
What does commissioning include?
Pressure and leak testing, refrigerant charging, start-up, pull-down to design temperature, controls and alarm verification, performance testing against the specification, operator training and handover documentation.
Does ColdMatch install refrigeration systems?
No. ColdMatch does not engineer, install, commission or operate anything. Its team reviews the project, contacts suitable independent manufacturers, integrators or EPC contractors on the buyer's behalf and presents organized responses; execution responsibility stays with the selected contractor.
Does ColdMatch provide financing?
No. ColdMatch is not a lender or bank. It may introduce qualified projects to independent third-party financing providers for evaluation; approval and terms are decided solely by those providers.
How are refrigeration suppliers selected?
Each request is reviewed manually. Suppliers or EPC contractors are shortlisted against the stated scope, technology, country, project scale and comparable references, and the buyer makes the final choice.
What is the difference between equipment supply and full EPC delivery?
Equipment supply covers delivered hardware only; the buyer manages design, installation and interfaces. Full EPC delivery puts engineering, supply, installation and commissioning under one contractor with single-point responsibility.