Contractor Network

Cold Storage Contractors — Design-Build, EPC & Turnkey Warehouses

Match with qualified cold storage contractors for refrigerated warehouses, blast freezers, pharma GDP facilities and cold chain expansions. From design-build to EPC turnkey, get 3–5 comparable bids in weeks.

Human Global Expert GuidanceVendor-Neutral ProcurementQualified International SuppliersCommercial Confidentiality

A senior cold-chain specialist stays with your project from first brief to commissioning.

Why source with ColdMatch

Specialist cold storage builders

Verified contractors with refrigerated warehouse, freezer and pharma-GDP project references — not general builders learning on the job.

Turnkey design-build & EPC

Single-accountable contracts covering envelope, refrigeration, racking, MEP, fire safety and commissioning.

All temperature bands

+15/+25°C CRT, +2/+8°C pharma, -18/-25°C frozen, -80°C ULT and controlled-atmosphere rooms.

Common RFP structure

One spec shared with 3–5 contractors so bids are directly comparable on scope, schedule and cost.

Certifications verified

ISO 9001/45001, BRCGS, IFS, HACCP, GDP, IIAR, ASME B31.5, PED and local codes checked before shortlist.

Energy-efficient designs

High-performance insulation, efficient refrigeration, LED and automation to lower 20-year OPEX.

40+ countries

Local and regional contractors in NA, EU, MENA, Africa, LATAM and APAC with in-country delivery teams.

Budget benchmarks included

2026 per-sq-ft and per-m² cost ranges by market and temperature band to sanity-check proposals.

Typical specifications we source

Facility types
Cold rooms, distribution centres, blast freezers, pharma GDP warehouses, automated cold stores
Temperature bands
+25°C CRT, +2/+8°C, -18/-25°C frozen, -80°C ULT, controlled atmosphere
Delivery models
Design-build, EPC turnkey, design-bid-build, construction management
Project scale
500 sq ft cold rooms to 500,000+ sq ft distribution hubs
Codes & standards
ASME B31.5, PED, EN 378, IIAR, BRCGS, IFS, HACCP, GDP
Typical timeline
Cold rooms 8–16 weeks; mid-size warehouses 8–14 months; large hubs 18–30 months

Frequently asked

How ColdMatch Group works — independent B2B procurement and sourcing platform ColdMatch Group is an independent B2B procurement and sourcing platform for industrial refrigeration, cold storage and cold-chain projects from USD $250K+, connecting buyers with qualified third-party suppliers, EPC contractors and independent financing providers.

Get matched with qualified suppliers

One RFQ — multiple competitive quotes from manufacturers, EPC contractors and turnkey providers worldwide.

Start Free RFQ
Topic hub

Cold storage construction & contractors

The full picture, from choosing a contractor to budgeting the build and issuing a comparable RFQ.

Related solutions

Qualify, then request quotes

Take this to a structured cold storage RFQ

Suppliers quote accurately only when capacity, temperature bands, throughput and site conditions are defined. Use the qualification guidance first, then issue one comparable RFQ.

Supplier-neutral. Free for buyers and project owners. Best suited to commercial projects from USD $250,000.

Get Free QuotesFind the Best Solution